BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition and site work for a municipal facility in Fontana, California. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

Scope of Services The work shall be done in one (1) phase. Demolition: Qualified contractor shall remove everything on the site per the contract documents, including, but not limited to, the building, slab, footings, asphalt parking lot, CMU walls, and all underground utilities. All utilities have been capped off-site. A demolition permit is required (Appendix IV) prior to commencement of work. All miscellaneous concrete, asphalt, concrete patios and walkways, out structures, and irrigation lines are to be removed. Public sidewalks are to remain and repaired if damaged during demolition. Remove all trees, bushes, landscaping, grass, and fencing located within the property lines. Provide 5' high chain link fence with wind/privacy screens during demolition and for at least 30 days after completion of the project. Fencing to be installed at the property must have two (2) 6' swinging, lockable gates at a minimum of two locations for multiple access points. Contractor will be responsible for dust control during operation. The cornerstone/dedication plaque on the southwest side of the building must be preserved in one piece Grading: Grading is to be done as per architectural specifications and any import or export of soil that may be necessary must be included. Permit: Demolition permit is required. A City of Fontana demolition packet shall be filled out and submitted at the time of permit request. (See Appendix IV) Inspections: The City Building Department is open Monday through Thursday. Any inspections called for on Fridays and Saturdays will be overtime inspections with all costs incurred by the contractor, unless specifically authorized by the construction manager. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Response Format Electronic Project Type Bid Type of Award Lump Sum Categories 91240 - Demolition Services License Requirements C-21 Bid Valid 90 Days Liquidated Damages One thousand Dollars ($1,000.00) per day for each and every calendar day of delay beyond the Contract Time or beyond any completion schedule, construction schedule or Project milestones established pursuant to the Contract Estimated Bid Value $130,000.00 Project Duration 30 Calendar Days Question Deadline 07/18/2023 at 2:00 PM PT

Award

Municipal

$128,168.00

Public - City

Demolition, Site Work

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
102
Bidding Soon
2,219
All Active Projects
997
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2023

August 24, 2023

img_map_placeholder

8425 Cypress Ave, Fontana, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.