BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a library in Waynesboro, Georgia. Completed plans call for the renovation of a library.

The Burke County Board of Commissioners is accepting bids for the service, labor & materials required to remove and replace HVAC Rooftop Unit #7 of the Waynesboro Library building. Owner has an existing Aaon RM-008-3-0-AA02 Packaged Rooftop unit that needs replacement. Contractor to provide and install the systems as detailed below: Equipment: Install one new Carrier 2023 DOE Compliant Equivalent Equipment Model number 48FCDM07A2A6 6ton 2-stage Gas/Electric Package unit with EcoBlue motor, Phase Monitor, Condensate Overflow Switch, Louvered Hail/Coil Guards, Winter start control, and Ultra Low Leak Enthalpy Economizer. Install one GPS-FC48 self-cleaning Ionization device. Contractor is to provide all necessary equipment, disposal of old equipment, Adapter Curb, Crane Cost, Gas Piping per current code requirements, condensate drain piping, approved emergency condensate cut-off designed for use with the specified rooftop equipment, new disconnect and associated wiring, controls and control wiring, permits and fees, labor, etc. for a complete installation. Equipment to have 5 year all parts warranty, 1 year labor warranty, and 10 year heat exchanger warranty. Controls & Owner Training:Equipment must be integrated into the countys existing Carrier iVu Control System. Contractors bid shall include a new test and balance for this unit which should be completed by a certified third-party TAB company. Supply airflow to be at 2000CFM with 375CFM of outside air. Contractors bid shall include all electrical requirements for a complete operable system per code. Contractors bid shall include a new electrical disconnect and whip to new RTU. Contractors warranty shall cover the new equipment and associated work only for a period of 1 year. Manufacturer Equipment warranty to cover 5 year all parts including compressor and 10 year heat exchanger. Contractor to recover refrigerant per EPA guidelines. Alternate Manufacturers equipment may be considered with prior approval by owner. Alternate equipment submittals must be submitted at least one week prior to bid to be considered.

Bid Results

Library

$19,200.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
48
Bidding Soon
561
All Active Projects
272
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2023

August 11, 2023

img_map_placeholder

130 GA-24, Waynesboro, GA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.