BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Minneapolis, Minnesota. Completed plans call for the renovation of a municipal facility.

The City of Minneapolis is issuing this Call for Bids for prospective suppliers provide all materials, labor, equipment and incidentals necessary for Gutter Repair and Cleaning Questions due by: June 29th, 2023 at 2:00 PM Prevailing Wage (Yes/No): Yes Basis of Award: A single contract will be awarded to the (overall) low, responsive, responsible bidder meeting all specifications. Substantial Project Completion: July/2023 Pre-Bid Meeting: No pre-bid meeting will be held If a lump sum bid for materials and/or equipment includes labor and all incidentals, the bidder is responsible for all applicable sales tax on taxable items required in the performance of the bid and should be included in the total amount of the bid. Laborers and Mechanics shall be paid according to the Contracts for Public Works Ordinance, Minneapolis Code of Ordinances, Chapter 24, Section 24.200 through 24.260, as amended, and the minimum wage rates and fringe benefits paid to the various classes shall be as determined by the Secretary of Labor of the United States, for work in the City, subject to and upon compliance with all requirements provided in the Rules of the Office of the Secretary of Labor of the United States. Apprentices may be paid less than the predetermined wage rate for the work performed. Apprentices must participate in a registered apprenticeship program (See 29 CFR, Parts 5 and 29). In addition to the certificates and other evidences of compliance which are required under these specifications and under Minneapolis Code of Ordinances, Section 24.240, it shall be required that the person or company representative submitting a bid for this contract shall certify in writing that both she/he/it and their Subcontractors shall comply with the wage and labor standard provision of Minneapolis Code of Ordinances, Section 24.200 through 24.260 as amended. Failure to comply with this ordinance shall mean the City may, by written notice to the Contractor, terminate the Contractor's right to proceed with the work and the Contractor and his Sureties shall be liable to the City for any excess cost occasioned to the City for the completion of the work.

Post-Bid

Municipal

$354,683.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
70
Bidding Soon
1,696
All Active Projects
590
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 11, 2023

August 11, 2023

December 29, 2023

img_map_placeholder

To Be Determined, Minneapolis, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.