BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, new construction and renovation of an educational facility in Santa Monica, California. Working plans call for the demolition of a 82,505-square-foot educational facility; for the renovation of a 45,254-square-foot educational facility; and for the construction of a 128,464-square-foot educational facility.

The project proposes to renovate and modernize the existing campus to develop new and renovated facilities that would support a project-based learning approach at McKinley ES that would expand instructional strategies currently in place within the District and would address future learning that is flexible, adaptable, and project centered in its delivery. The project would be constructed in three phases over approximately 5.70 acres of the 6.48-acre campus. Building Removal and Demolition: Phase 1: Eleven Portable Classrooms (10,560 square feet) Playground Restrooms (468 square feet) Existing Parking Lot (35,284 square feet) Phase 2: Removal of Elevator that serves Buildings B and C (397 square feet) Phase 3: One Modular Building (Building D) (3,796 square feet) Interim Parking Lot (32,000 square feet) Total Development: Phase 1: One New Classroom Building (New Elementary Classrooms and New Front Office and School Support Spaces) (24,410 square feet) -Cost Estimate: $29M -Construction Manager: Cumming Construction Management New Parking Lot (Arizona Avenue/ Chelsea Avenue) (32,000 square feet) Renovated Library (1,354 square feet) New Playfields and Playgrounds (14,500 square feet) Phase 2: Renovation of Building C (2,330 square feet) Lunch Shelter along Building A (3,500 square feet) New Elevator and Stair Core for Buildings B and C (870 square feet) Phase 3: New Two-Story Building for T-K/ Kindergarten and Elementary Classrooms (26,500 square feet) New Parking Lots (Arizona Avenue/ 23rd Court) (23,000 square feet) As of November 2023, the project is on hold due to a delay in receiving approval from the Division of State Architects (DSA), additional environmental testing was required, and the bids for construction came in over budget.

Pre-Construction/Negotiated

Educational

$40,000,000.00

Public - City

Demolition, New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
99
Bidding Soon
2,193
All Active Projects
977
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2024

img_map_placeholder

2401 Santa Monica Blvd, Santa Monica, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.