BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Cottleville, Missouri. Completed plans call for site work for a water / sewer project.

**As of August 9, 2023, this project has not yet been awarded. The project is expected to be awarded approximately August 22nd.** Each separate bid must be accompanied by certified check or bank cashier's check payable to the Owner, or a bid bond, duly executed by the bidder as principal and having as surety thereon a surety company meeting the requirements as referenced in the Instructions to Bidders in the amount of 10% of the bid. Such checks or bid bond will be returned to all except the three lowest bidders within ten days after the opening of bids, and the remaining cash, checks or bid bonds will be returned promptly after the Owner and the accepted bidder have executed the contract. The Owner reserves the right to reject all Bids; to reject any non-responsive Bid; to waive informalities in the Bids; and to determine the low, responsive, responsible Bid. The Owner reserves the right to award the project in a manner that is deemed by the Owner to be in the best interests of the Duckett Creek Sanitary District. The work includes, but is not limited to, installation of approximately 4,900 lineal feet of 8" force main using primarily trenchless (horizontal directional drilling) methods. Open cut installation will be allowed in some locations. Work also includes but is not limited to excavation, erosion control, site restoration, traffic control, and ancillary work as necessary for a complete and satisfactory project as shown on the Drawings and specified herein. The successful bidder will be required to agree that not less than the prevailing rate of wages will be paid to all workmen, laborers, and mechanics performing their work under this contract. The alignment follows Wyndgate Valley Drive, goes south on Paul Renaud Blvd, turns west on Diehr Rd, then crosses Grayleaf Ct to the southwest. CMT has indicated the sewer will likely be constructed with both cut and cover and jack and bore techniques. Duckett Creek Sanitary District Administrative Office, 3550 State Highway K, O'Fallon, Missouri 63368. Attendance at the pre-bid conference is highly recommended, but not mandatory The latest possible date to request clarification of any item related to this project Monday, July 17th at noon

Award

Water / Sewer

$801,493.00

Public - County

Site Work

16

20

6

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
43
Bidding Soon
828
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2023

October 2, 2023

img_map_placeholder

Multiple Locations, Cottleville, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.