BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 14, 2026 at 8:00 PM

Updated July 16, 2026

Site work and paving for a mixed-use development in Cottleville, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Proposed Work Includes: Roadway Reconstruction, Sidewalks, Storm Sewers and Inlets, Signing and Striping, and Other Miscellaneous Work as Required to Complete the Project. Calendar Days: 173 Liquidated damages per day $ 1,225.00 All Labor Used in the Construction of This Public Improvement Shall Be Paid a Wage No Less Than the Prevailing Hourly Rate of Wages of Work of a Similar Character in This Locality as Established by the Department of Labor and Industrial Relations (Federal Wage Rate), or State Wage Rate, Whichever is Higher. The Prime Contractor Must Be on Modot's Approved Contractor Listing.All Labor Used in the Construction of This Public Improvement Shall Be Paid a Wage No Less Than the Prevailing Hourly Rate of Wages of Work of a Similar Character in This Locality as Established by the Department of Labor and Industrial Relations (Federal Wage Rate), or State Wage Rate, Whichever is Higher. The Prime Contractor Must Be on Modot's Approved Contractor Listing. The City of O'fallon Reserves the Right to Reject Any or All Bids. No 2nd tier subcontracting will be allowed on this project. The Dbe Goal for This Project is 0%. A Certified or Cashier's Check or a Bid Bond in the Amount of 5% Shall Be Submitted With Each Proposal. The Contractor Questionnaire Must Be on File 7 Days Prior to Bid Opening. The Project Will Be Awarded to the Lowest, Responsive, Responsible Bidder. All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for highway Construction, 2025 Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. The project will be awarded to the lowest, responsive, responsible bidder. Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. Question Deadline 08/04/2026 Online Portal- Questionnaire and/or Contractor Prequalification Questionnaire with attachments no later than seven (7) days prior to the date and hour of the bid opening. All questions concerning the bid document preparation can be directed to the City of O'Fallon Engineering Department at 636-379-5596. Project specific questions can be directed to the City of O'Fallon Engineering Department at 636-379- 5596 or Kevin O'Shaughnessy at CDG Engineers, 314-781-7770.

GC Bidding

Roads / Highways

$1,100,000.00

Public - City

Paving, Site Work

3

3

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
4
Bidding Soon
1,449
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2025

Project location map

Eggering Dr, Cottleville, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.