BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 9, 2023 at 8:00 PM

Updated April 23, 2024

Site work and renovation of a water / sewer project in Joplin, Missouri. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

1.1 The work consists of furnishing all labor, materials, equipment, tools, supervision and testing to complete the project as described in these specifications and as shown on the drawings. Work includes but is not limited to the removal and replacement of concrete piers supporting an aerial sewer crossing including streambank improvements with rip-rap armored embankment, seeding and mulching, and miscellaneous site work as shown on the plans. All work indicated on the drawings and specifications is to be performed unless deleted by Owners change order. 1.2 Location: The project site is located as shown on the drawings. 1.3 Access: Access by the Contractor and/or his employees to the site and other areas of construction is available via public roads, streets, and easements. 1.4 Safety: Precautions shall be exercised at all times by the Contractor for the protection of persons, employees, and property. The safety provisions of applicable laws and local building and construction codes (OSHA and manufacturers safety requirements) shall be observed. The Contractor shall be solely and completely responsible for conditions of the job site, including safety of all persons and property during performance of the work. 1.5 Inclusive in the work is close coordination with all appropriate jurisdictional agencies and responsibility for construction standards, traffic control, and safety requirements of these agencies Bidders with questions concerning this Invitation may contact Blake Watson, P.E., Allgeier, Martin and Associates, Inc., 7231 East 24th Street, Joplin, Missouri 64804, 417-680-7200 The work to be performed consists of the removal and replacement of concrete piers supporting the aerial sewer crossing including streambank improvements including rip-rap armored embankment, seeding and mulching, and miscellaneous site work as shown on the plans.

Bid Results

Water / Sewer

$110,992.00

Public - City

Renovation, Site Work

8

14

2

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
0
Bidding Soon
525
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2023

August 17, 2023

Project location map

3457 W Eddy Ln, Joplin, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.