Site work for a water / sewer project in West Jordan, Utah. Completed plans call for site work for a water / sewer project.

DESCRIPTION OF WORK: The Work comprises modifications and/or abandonment of five (5) vaults and associated piping and valves, including the locations and Work below: 1. 4390 S 2200 W - Taylorsville - Abandon vault, bury gate valves, and relocate air vac manhole to the right-of-way on the side of the street. 2. 4330 S 300 W - Murray - Abandon vault, bury gate valves, and relocate air vac manhole to the right-of-way on the side of the street. 3. 4500 S 350 E - Murray/Millcreek boundary - Modify blowoff manhole piping and valves. 4. 11400 S 100 E - Draper / Sandy boundary - Remove existing and replace vault roof, valves, welded steel pipe, electrical, and communications. 5. 11400 S 700 E - Draper / Sandy boundary - Remove and replace existing welded steel pipe, valves, electrical, and communications. Each bid shall be accompanied by a certified or cashier's check, money order or bid bond in the amount of five percent of the total bid price. Performance bond in the amount of 100 percent of the total bid price and a payment bond in the amount of 100 percent of the total bid price. All work shall be completed within 475 calendar days from the date of the Notice to Proceed. The Owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the Owner. All questions relative to this project prior to the opening of bids shall be directed to the Engineer for the project. It shall be understood, however, that no interpretations of the specifications will be made by telephone, nor will any "or equal" products be considered for approval prior to award of contract. ENGINEER Hansen, Allen & Luce, Inc, office (801) 566-5599 859 W. South Jordan Parkway, South Jordan, Utah 84095 Contact: Tyler Allen, P.E., cell 435-764-2415 Email: tallen@halengineers.com Bid Results :: Total Bid Schedule A :: Stapp Construction :: 373,650 Total Bid Schedule B :: Stapp Construction:: 988,380

Award

Water / Sewer

$2,600,000.00

Public - County

Site Work

43

17

12

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
77
Bidding Soon
995
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

December 23, 2024

Project location map

Multiple Locations, West Jordan, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.