Published March 7, 2025 at 7:00 PM
Updated March 8, 2025
Site work for a water / sewer project in West Jordan, Utah. Completed plans call for site work for a water / sewer project.
**As of March 7, 2025 this project has not yet been awarded. A timeline for award has not yet been established.** The Work to be performed under this Contract consists of furnishing all facilities, tools, equipment, materials, supplies, and manufactured articles, and furnishing all labor, transportation, and services including fuel, power, water, essential communications, permits, and performing all Work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The Work will provide the next reach of a parallel conveyance facility to the Districts' Jordan Aqueduct Reach 2 (JA-2) in order to meet future water demands within the District's service area. The Work of this Contract generally includes the construction of the Southwest Aqueduct Reach 2 (SWA-2) from 13400 South in Riverton City to 11800 South in South Jordan City. The SWA-2 Project includes approximately 10,550 feet of new 66-inch diameter welded steel pipe including two trenchless crossings with casings, air valve structures, major and minor drains, and modifications to the existing 12600 South - JA-2 Vault. The Work also includes construction of an addition to the existing 11400 South JA-2 turnout structure for installation of a new 78-inch isolation valve on the Jordan Aqueduct. Project work also includes cathodic protection and instrumentation at several locations. The Work is primarily located along 3200 West between 13400 South and 11800 South and includes connections to existing SWA-2 at both ends. The Work is primarily located in Riverton, Utah with a portion of work at an existing JVWCD property at 11400 South in South Jordan, both in Salt Lake County The beginning point of the pipeline will connect to an existing 66-inch steel pipeline at 13390 South 3200 West with the ending point connecting to an existing 60-inch steel pipeline at 11800 South 3200 West. Work will also be performed at 11400 South 3200 West to construct a JA-2 main-line valve vault on an existing 78-inch diameter pipeline. COMPLETION OF WORK: All work shall be Substantially Complete within 750 calendar days from the date of the Notice to Proceed. BID SECURITY: Each bid shall be accompanied by a certified or cashier's check, money order or bid bond in the amount of five percent of the total bid price payable to the Jordan Valley Water Conservancy District as a guarantee that the bidder, if its bid is accepted, will promptly execute the contract, provide evidence of worker's compensation insurance, and furnish a satisfactory faithful performance bond in the amount of 100 percent of the total bid price and a payment bond in the amount of 100 percent of the total bid price. The Owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the Owner. All questions relative to this project prior to the opening of bids shall be directed to the Engineer for the project.
Bid Results
Water / Sewer
$30,726,277.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2025
April 28, 2025
Multiple Locations, West Jordan, UT
Related To This Project
West Jordan, UT
Bid Date: Jul 19 2023
West Jordan, UT
--
West Jordan, UT
Bid Date: Aug 14 2023
West Jordan, UT
Bid Date: May 27 2020
West Jordan, UT
Bid Date: Sep 08 2023
West Jordan, UT
Bid Date: Aug 23 2023
West Jordan, UT
Bid Date: Sep 27 2023
West Jordan, UT
--
West Jordan, UT
Bid Date: Oct 24 2024
West Jordan, UT
Bid Date: Jul 20 2023
West Jordan, UT
Bid Date: Jun 23 2023
West Jordan, UT
Bid Date: Jun 23 2023
West Jordan, UT
Bid Date: Dec 04 2024
West Jordan, UT
Bid Date: Jun 22 2023
West Jordan, UT
Bid Date: Jun 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.