BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in West Jordan, Utah. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Construct a new asphalt paved parking lot east of airport road. Work includes: excavation, importing fill, exporting spoils, compaction, concrete work, site electrical work, fencing, per the design and specifications. Construction Cost Estimate: $1,850,000.00 ONLY FIRMS PRE-QUALIFIED DURING STAGE I OF THE RFS ARE ALLOWED TO BID ON THIS PROJECT Question Submission Close Date 7/6/2023 3:00 PM MDT The project site is located at the Utah National Guard Air Base Facility located at 7602 Airport Road in West Jordan, Utah (see Figure A-1, Site Vicinity Map). Our understanding of the project is based on the exhibit provided by Ensign Engineering, the Grading and Drainage Plan (Sheet C-300) prepared by Ensign Engineering (print date October 3, 2023), as well as information provided via communication with Mr. Koby Morgan, P.E., of Ensign Engineering. The projectsite is a rectangular-shaped area (about 2.9 acres), located north of 7800 South and East of Airport Road, within the existing airport facility. We understand that the Utah National Guard (UNG) is considering a number of improvements for the project area, which includes developing the subject parcel into a parking lot with a number of related improvements, including a new guard house on the north entrance. We understand that the center area will be used as a parking lot for passenger vehicles and potentially military vehicles (i.e. large, heavy transport trucks). Furthermore, a new storm water detention basin (underground galleries) is planned on the southern end of the project area. We understand that finished grades will be between zero to four feet above existing grade; maximum fills will be on the northern and southern extents, with minor cuts at the west-central portion of the site. The storm water detention basin is planned to be located on the southern extents of the property, in the general vicinity of the test pit TP-4

Post-Bid

Sidewalks / Parking Lot

$1,850,000.00

Public - State/Provincial

Paving, Site Work

34

14

5

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
28
Bidding Soon
533
All Active Projects
254
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2023

September 18, 2023

img_map_placeholder

Airport Rd, West Jordan, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.