Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Seattle, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.
Project Location: Thomas Street between 5th Ave N and Dexter Ave N, and Taylor Ave N between Thomas Street and Harrison Street. Construct bicycle, pedestrian, drainage, and traffic signal improvements including a widened sidewalk and bicycle zone on the north side of Thomas Street, a protected intersection at Thomas Street and Dexter Avenue, new curb ramps, sidewalk, pavement repair, bicycle signals, pedestrian lighting and new signal poles. For the purpose of the Bidder/Subcontractor list, this project includes electrical work and rebar installation. Clarification Deadline: 7/14/2023 5:00 PM There is no pre-bid site inspection meeting scheduled for this project. The Bidder has attached a Bid Guaranty in the amount of five percent (5%) of the Total Bid including retail sales tax in the form of cashier's check, certified check, or Bid bond All questions on the Inclusion Plan must be directed to Miguel Beltran at Miguel.beltran@seattle.gov or 206-684-4525. Backup contact is Carmen Kucinski at carmen.kucinski@seattle.gov or 206-684-0188. Work must begin immediately on the Notice To Proceed Date in the Written Notice from the Engineer and after the date of such notice must be physically completed within the following period per Section 3 of the Agreement: 130 Working Days If the successful Contractor fails to complete Work within the time set forth above, (s)he will be charged Liquidated Damages per Section 4 of the Agreement and Section 1-08.9. See Section 1-08.9 for method for determining cost of liquidated damages. A/E Estimate: $3,700,000 to $4,100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Roads / Highways
$4,100,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 19, 2023
September 18, 2023
Multiple Locations, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Jul 05 2023
Seattle, WA
Bid Date: Aug 03 2023
Seattle, WA
Bid Date: Sep 01 2023
Seattle, WA
Bid Date: Jul 11 2023
Seattle, WA
Bid Date: Sep 08 2023
Seattle, WA
Bid Date: Jul 19 2023
Seattle, WA
Bid Date: Jul 18 2023
Seattle, WA
Bid Date: Jul 20 2023
Seattle, WA
Bid Date: Jul 11 2023
Seattle, WA
Bid Date: Jun 14 2022
Seattle, WA
Bid Date: Jul 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.