BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Uvalde, Texas. Contact the soliciting agency for additional information.

City of Uvalde is seeking a qualified engineer or engineering firm to conduct and prepare a Master Water Plan The Master Water Plan will be broken down into tasks. These generally constitute the following: Compile the current water supply source(s) capacity and future needs of water, to develop the basis for a water acquisition planning framework. Compile background information regarding the existing system, its operation, and its condition to develop the basis for the planning framework. Coordinate with City personnel to develop water demand projections. Develop water demand projections through build-out. Document the City's water resource portfolio, including quality, and develop a supply/demand balance. Create a working water model (developed in Water CAD, or equal) of the City's existing water system. Utilize the water model to evaluate the condition/capacity/performance of the existing system and document suggested improvements (in order of priority) to the system's infrastructure (including locations, lengths, sizes, and cost estimates, etc.) that are necessary to bring the system into compliance with regard to current demands (Public Drinking Water and Fire Protection). Utilize the water model to evaluate the system for projected demands and document suggested improvements (in order of priority) to the system's infrastructure (including locations, lengths, sizes, cost estimates, etc.) that are required to accommodate future demands. Identify potential locations, sizes, and costs for elevated storage tanks. Identify projects, schedules, and estimated costs to be included in the City's Capital Improvement Plan. Identify potential developer-driven initiatives for City review and consideration. Prepare and Complete a Master Water Plan report. All questions shall be submitted via email, and titled, "MWP-RFQ Question", to Juan Zamora Public Works Director by 4:00 pm on Thursday, July 27, 2023, at zamora@uvaldetx.gov

Conceptual

Water / Sewer

$1,500,000.00

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
11
Bidding Soon
357
All Active Projects
133
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2024

img_map_placeholder

Multiple Locations, Uvalde, TX

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.