BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 20, 2023 at 8:00 PM

Updated November 15, 2023

Demolition, site work and new construction of a power facility in Windom, Minnesota. Working plans call for the demolition of a power facility; for the construction of a power facility; and for site work for a power facility.

**As of September 20, 2023, project did not received any bids. No definite date for the rebid.** The general nature of the work on which bids will be received consists of the demolition of an existing building, construction of a new generating plant building, installation of two new dieselfired generating units and auxiliary equipment, along with the connection to the power plant switchgear. The above work shall be in accordance with the specifications and proposed form of contract now on file in the City Clerks Office, 444 9 th Street, Windom, Minnesota, by this reference made a part hereof, as though fully set out and incorporated herein. The general nature of the work on which bids will be received consists of the demolition of an existing building, construction of a new generating plant building, installation of two new diesel-fired generating units and auxiliary equipment, along with the connection to the power plant switchgear. Est. Completion Date: July 15, 2024

Final Planning

Power Plant

$5,000,000.00

Public - City

Demolition, New Construction, Site Work

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
28
Bidding Soon
377
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2023

March 20, 2024

Project location map

1105 1st Ave N, Windom, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.