BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Berwyn, Alberta. Contact the soliciting agency for additional information.

A. The crushing of approximately 50,000 tonnes of gravel at the following MD owned gravel pits: o Quinney Pit (SW25-83-24-W5) - Designation 4 - Class 25 aggregate - 5/8" Crush o Brownvale Pit (SW3-82-26-W5) - Designation 4 - Class 25 aggregate - 5/8" Crush B. Supply equipment to crush and stockpile the gravel aggregate consistent with the stipulated schedule. Elimination of fines will be required and placed in a separate stockpile. Crushed gravel must be stockpiled with a conveyor and it must be scaled. C. The Municipal District will have the mining area cleared and stripped prior to crushing commencing. D. Conduct Quality Control testing on the crushed gravel aggregate being produced to ensure that the crushed gravel aggregate meets the required materials specification. E. The Contractor will be required to do sieve test analysis on a daily basis using a qualified tester at his own expense and must provide the MD with a copy of the results within 24 hours of the sample being taken. F. Testing shall also be performed by the MD or its designate, at a frequency deemed necessary by the Public Works Foreman. The Contractor shall adjust and modify aggregates as required to meet specification requirements. The MD reserves the right to reject any material that does not meet the Designation 4 Class 25 specifications. G. Crushed aggregate produced shall comply fully with the specifications outlined herein, and the Contractor shall recognize and satisfy himself as to the type and amount of work that may be necessary to produce the material required. The Contractor shall be fully responsible for changing, adjusting, and/or modifying his crushing operations, as may be required, to ensure that the crushed gravel aggregate specification requirements are met. H. The crushed gravel aggregate shall be composed of sound, hard, and durable particles of sand, gravel and rock and shall be free of elongated particles, injurious quantities of flaky particles, shale, organic matter, clay lumps, and any other foreign matter, meeting the gradation specifications outlined herein. I. The crushing component cannot start until after August 15, 2023 and must be completed in its entirety by October 15, 2023 and the Contractor will provide to the MD a proposed crushing schedule. J. The Contractor is responsible for all applicable insurance and WCB costs and hereby agrees to indemnify and save harmless the MD, its agents and/or its employees, from and against all actions, suits, claims or demands arising from work described herein. K. The stockpile is to be placed on a solid base in a location as directed by the MD's Public Works Foreman. The area around the stockpile is to be level, free of debris, and easily negotiable for gravel hauling trucks, under their own power. There shall be an efficient and effective truck turn around area, in close proximity to the stockpile. L. The height of the stockpile must not exceed a safe level when gravel is being removed from the pile. M. The MD reserves the right to direct its own forces to haul aggregate directly off the crusher or from the stockpile. The Contractor will make every attempt to accommodate this work. N. A 10% bid bond or letter of credit must be supplied by the successful Bidder prior to August 15, 2023.

Post-Bid

Roads / Highways

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
3
Bidding Soon
25
All Active Projects
5
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.