BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Rock Island, Illinois. Completed plans call for the renovation of a municipal facility.

All questions shall be directed to the Construction Officer at 309-732-2906. This Project has been cleared of LBP. All work that is done must comply with LBP protocol and not disturb any of the interim or abated controls put in place from the previous completed work. Remove the existing brick chimney off the addition on the south side. Once below the roof line, cap the top with air tight noncombustible material Preventing it from ever being used. Remove existing shingles down to sheathing. Check over all the existing roof sheathing for any water damage, broken boards, and larger than 1/2 " gaps between sheathing replace as needed. If sheath over is required a change order must be okayed by the Construction Officer before continuing. Patch the existing holes from the turtle/can vents. Remove the sheathing at the ridge per shingle over vent manufactures directions. Install ice and snow guard around the lower section of roof making sure to cover at least a 2 ft over top plate on the exterior walls below. Installed approved water barrier over the remainder roof. Install 30-year architectural shingles homeowners' choice of colors. New shingle over ridge vent. New chimney flashing and counter flashing. New plumber boots over the vents and split ring for the mast flashing. New 2" white style D roof edge. Install Tyvek house wrap over all the existing wood siding over lapping 6", tape all the seams. Install 1/4 " fan fold over the house wrap taping all the seams installed with cap nails. Bend white break metal around the bottom of wall installing over the wrap and fold and returning to the foundation. Install double 4" vinyl siding choice of colors the homeowner selects from samples provide by the contractor. All wall and floor penetrations shall have either a light block or split trim installed and caulked with a color match. All top course pieces must be snap-locked into a utility trim preventing siding from blowing off. Install missing soffit and fascia mostly on the room addition. Install new white gutters and downs through out the entire house. Install 6' tail pipes off the downs with hinged flip-ups securing the tails from being blown off. Minimum 2 straps per 8' of down securing to the wall. All Connections must have at least 2 white screws per joint. Contractor must have permit before the work begins.

Bid Results

Municipal

$30,850.00

Public - City

Renovation

4

3

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
32
Bidding Soon
551
All Active Projects
273
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2023

August 30, 2023

img_map_placeholder

11th St, Rock Island, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.