Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 13, 2023 at 8:00 PM
Updated January 26, 2024
Site work and paving for a mixed-use development in Richmond, California. Conceptual plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The project proposes to design a bike optimized trail within a corridor identified in Wildcat Canyon Regional Park near Richmond, CA. The proposed trail corridor follows a west facing grassland ridgeline in the northern portion of the park.The site is approximately two miles in from the parks entrance at Alvarado Staging Area, found at 5845 Park Ave, Richmond, CA 94805 and four and one-half miles from the Inspiration Point Staging Area Please direct any questions regarding this RFP to Sean Connelly, Trails Coordinator, sconnelly@ebparks.org and Suzanne Wilson, Senior Planner, swilson@ebparks.org. All questions are due no later than 5:00 pm. (local time) on July 19th, 2023. The Park District reserves the right to reject any or all RFPs, whether or not minimum qualifications are met, and to modify, postpone, or cancel the RFP without liability, obligation, or commitment to any party, firm, or organization. In addition, the Park District reserves the right to request and obtain additional information from any candidate submitting an RFP, and to waive any minor informality or irregularity The Park Districts budget for this phase of the project is not to exceed $25,000. Provide a total cost proposal for all services outlined in this RFP including a breakdown of costs delineated by task. Include a schedule of hourly rates for proposed staff/subconsultants and amount of time each person will be devoted to each task. Define any reimbursable expenses. The terms of this contract will be time and materials based on specific rates of compensation. The specific rates of compensation, except for an individual acting as a sole proprietor, are to include an hourly breakdown, direct salary costs, salary additives, indirect costs, and net fee. Net fee should be specified as a dollar amount, not as a percentage. Mark ups on reimbursable expenses Consultant Questions due......................................................................................7/19/2023 Interview short listed firms (If necessary)......................................... Week of 7/31/2023 Contract approval by Assistant General Manager..................................................8/2023 There will be no pre-submittal meeting or site visit scheduled for this RFP). The project site is publicly accessible during park hours of operation. The method of Contractor Selection has not been Determined at this time.
Conceptual
Playgrounds / Parks / Athletic Fields
$500,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
