BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Moraga, California. Contact the soliciting agency for additional information.

The base Scope of Work ("Work") includes but is not limited to: Furnish all labor, materials, equipment, and performing all work necessary and incidental to the removal and installation of Portland Cement Concrete pavements with or without colorant, concrete surface treatments such as stamping or staining, minor grading and earthwork, minor placement and compaction of aggregate base, surveying, and grade-setting, and all appurtenant work thereto required by the Contract Documents, inclusive of the plans and specifications, and the applicable Caltrans Standard Specifications and the Special Provisions, Laws, rules, and regulation of the State of California and the Owner, and as directed by the Owner. Engineer's Estimate: $850,000 Project shall have Substantial Completion of items within 30 working days and Final Completion within 45 working days from the date specified in the Notice to Proceed. Time for commencement and completion of the work is important. Question Deadline 06/10/2024 at 5:00 PM PT Questions regarding the contract documents shall be submitted in writing to Deirdre Castillo, Senior Engineer Town of Moraga Email all questions to both of the following addresses: publicworks@moraga.ca.us dcastillo@moraga.ca.us Each bid must be submitted using the Bid Proposal Form provided with the Contract Documents. In accordance with California Public Contract Code Section 20170, each Bid Proposal must be accompanied by a bid security of ten percent (10%) of the Base Bid amount, in the form of a cashier's or certified check made payable to Owner, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The bid security shall guarantee that upon award of the bid, the bidder shall execute the Contract and submit payment and performance bonds and insurance certificates as required by the Contract Documents within seven (7) days following notice of award of the Contract. Performance and payment bonds in an amount of 100% of the Contract price shall be required of the successful bidder prior to execution of a contract. A warranty bond is required upon completion of the project. All bonds submitted shall be from admitted sureties.

Post-Bid

Water / Sewer

$850,000.00

Public - City

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
90
Bidding Soon
1,884
All Active Projects
790
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2024

July 19, 2024

img_map_placeholder

Multiple Locations, Moraga, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.