BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fitness / recreation center in Clemson, South Carolina. Completed plans call for the renovation of a fitness / recreation center.

Clemson University seeks an experienced supplier to remove and replace three Gym Divider Curtains at Fike Recreation Center. Question Cutoff Date: 8/2/2023 12:00 AM (ET) *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Clemson University seeks an experienced supplier to provide the replacement of three Gym Divider Curtains at Fike Recreation Center as described herein. This is a one-time purchase and an award will be made to one offeror. Award will be made to one offeror that is responsive, responsible, and offers the most advantageous pricing to Clemson University. Alternates or approved equals are allowed. Products are to meet specifications and requirements as detailed in section III Scope of Work/Specifications. If an alternate is being offered; it shall be equal to or exceed the specifications as determined by Clemson University. Any reference to brand names, trade names, model numbers, or other descriptions particular to specific brand products is made to establish a required level of quality and functional capabilities; it is not intended to exclude other products of that level. Comparable products of other manufacturers will be considered if proof of comparability is contained in the bid submission Clemson University is seeking a contractor to remove existing divider curtains and install new divider curtains for the Fike basketball court. 1. The contractor must provide all materials including curtains, drive pipe, motor control switches, and all hardware needed to install the system. 2. The replacement must include protection of the basketball court floor by means of covering. The price must include the removal and disposal of the existing curtains, drive pipe, motors, and control switches. 3. The contractor must include all equipment, scaffolding, lifts etc. 4. The contractor must include the electrical connection at the motor and the replacement of the wall switches. 5. The replacement must take place beginning December 16 th , 2023 and completed by December 23rd, 2023

Award

Fitness / Rec Centers

$42,348.00

Public - State/Provincial

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
40
Bidding Soon
841
All Active Projects
396
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2023

December 16, 2023

img_map_placeholder

110 Heisman St, Clemson, SC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.