Site work for a water / sewer project in Newport Beach, California. Completed plans call for site work for a water / sewer project.
The work necessary for the completion of this contract consists of: 1. Mobilization of equipment and personnel to the well site. 2. Disconnecting the piping & electrical systems from the well and removing the motor, pump column and pump bowls from the well. Inspect the condition of the pump system and submit a report to the City for its refurbishment/repair or for replacement. City staff will handle all electrical disconnections from the permanent motor. The permanent motor may be stored on-site inside the pump house on a pallet supplied by Contractor. 3. Initiate biocleaning of the well casing by injecting hydrogen peroxide solution throughout the perforated sections of the well casing to help remove encrusting material and/or biofilm from the casing walls. Conduct wire-brushing and bailing of sediment fill from the bottom of the casing. 4. Conduct an interim video survey of the entire well casing. 5. Conduct chemical treatment of the well using Herc Chem Tech LLC (HCT) solutions. Add additional chemical treatment with acid. 6. Perform mechanical redevelopment via simultaneously swabbing and airlifting of the chemical solutions from the well. Fluids generated during this process shall be treated prior to discharge to the local storm drain system. 7. Perform an interim video survey to help ensure the effectiveness of the chemical and mechanical rehabilitation operations. 8. Perform a caliper survey to verify the casing diameters of the well. 9. Install a Type 304L Stainless Steel full casing liner and gravel pack, as specified. 10. Perform Air-Jetting of the well to help seat the new gravel pack around the newly-installed casing liner and to help open up the original gravel pack used for the original well. 11. Mobilize, install, operate, maintain, and then remove a temporary test pump and test motor capable of pumping up to 3,000 gpm. 12. Conduct pumping redevelopment by pumping and surging. 13. Conduct a 12-hour step-drawdown test and a 24- to 48-hour constant rate pumping test. 14. Near the end of the constant rate pumping test, perform a dynamic spinner survey in the newly-lined well. 15. Remove the test pump and perform a final video survey to check the casing liner for possible damage from installation and/or removal of temporary test pump, and to determine the amount of sediment fill at the bottom of the casing liner; bail the accumulated sediment. 16. Re-install the new pump components in the well and conduct vibration testing, and trim balance; disinfect the pump components during installation. 17. Perform a 3-day (72-hour) period of continuous pumping test at the design rate. 18. Perform well chlorination and clean up the well site. 19. Perform site restoration activities at the well site. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Q&A Deadline 08/08/2023 6:00 PM (PDT) Project Duration 60 Consecutive Working Days
Award
Water / Sewer
$817,024.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 15, 2023
November 6, 2023
Multiple Locations, Newport Beach, CA
Related To This Project
Newport Beach, CA
Bid Date: Jul 28 2023
Newport Beach, CA
Bid Date: Nov 30 2021
Newport Beach, CA
Bid Date: Aug 22 2023
Newport Beach, CA
Bid Date: Aug 15 2023
Newport Beach, CA
Bid Date: Sep 05 2023
Newport Beach, CA
Bid Date: Sep 14 2023
Newport Beach, CA
Bid Date: Oct 05 2023
Newport Beach, CA
Bid Date: Oct 26 2023
Newport Beach, CA
Bid Date: Jul 13 2023
Newport Beach, CA
--
Newport Beach, CA
Bid Date: Jul 21 2023
Newport Beach, CA
Bid Date: Aug 03 2023
Newport Beach, CA
Bid Date: Jun 30 2023
Newport Beach, CA
Bid Date: Oct 25 2023
Newport Beach, CA
Bid Date: Jul 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.