Site work for a water / sewer project in Newport Beach, California. Completed plans call for site work for a water / sewer project.

The work necessary for the completion of this contract consists of: 1. Mobilization of equipment and personnel to the well site. 2. Disconnecting the piping & electrical systems from the well and removing the motor, pump column and pump bowls from the well. Inspect the condition of the pump system and submit a report to the City for its refurbishment/repair or for replacement. City staff will handle all electrical disconnections from the permanent motor. The permanent motor may be stored on-site inside the pump house on a pallet supplied by Contractor. 3. Initiate biocleaning of the well casing by injecting hydrogen peroxide solution throughout the perforated sections of the well casing to help remove encrusting material and/or biofilm from the casing walls. Conduct wire-brushing and bailing of sediment fill from the bottom of the casing. 4. Conduct an interim video survey of the entire well casing. 5. Conduct chemical treatment of the well using Herc Chem Tech LLC (HCT) solutions. Add additional chemical treatment with acid. 6. Perform mechanical redevelopment via simultaneously swabbing and airlifting of the chemical solutions from the well. Fluids generated during this process shall be treated prior to discharge to the local storm drain system. 7. Perform an interim video survey to help ensure the effectiveness of the chemical and mechanical rehabilitation operations. 8. Perform a caliper survey to verify the casing diameters of the well. 9. Install a Type 304L Stainless Steel full casing liner and gravel pack, as specified. 10. Perform Air-Jetting of the well to help seat the new gravel pack around the newly-installed casing liner and to help open up the original gravel pack used for the original well. 11. Mobilize, install, operate, maintain, and then remove a temporary test pump and test motor capable of pumping up to 3,000 gpm. 12. Conduct pumping redevelopment by pumping and surging. 13. Conduct a 12-hour step-drawdown test and a 24- to 48-hour constant rate pumping test. 14. Near the end of the constant rate pumping test, perform a dynamic spinner survey in the newly-lined well. 15. Remove the test pump and perform a final video survey to check the casing liner for possible damage from installation and/or removal of temporary test pump, and to determine the amount of sediment fill at the bottom of the casing liner; bail the accumulated sediment. 16. Re-install the new pump components in the well and conduct vibration testing, and trim balance; disinfect the pump components during installation. 17. Perform a 3-day (72-hour) period of continuous pumping test at the design rate. 18. Perform well chlorination and clean up the well site. 19. Perform site restoration activities at the well site. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Q&A Deadline 08/08/2023 6:00 PM (PDT) Project Duration 60 Consecutive Working Days

Award

Water / Sewer

$817,024.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
107
Bidding Soon
2,424
All Active Projects
1,068
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2023

November 6, 2023

img_map_placeholder

Multiple Locations, Newport Beach, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.