BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a medical facility in Desoto, Missouri. Completed plans call for the renovation of a medical facility.

The Valle Ambulance District is requesting sealed bids for the roof replacement of Valle Ambulance District House 2. The Board of Directors of the Valle Ambulance District reserves the right to reject any and all proposals, to waive technical, or legal deficiencies, and to accept any proposal that it deems to be in the best interest of the Valle Ambulance District. Removal and Replacement of shingled roof at Valle Ambulance District House Two. 1540 Hillcrest Dr, DeSoto MO 63020 The Valle Ambulance District is seeking proposals from qualified contractors to furnish and install a new shingled roof or standing seam metal roof on the structure, 1540 Hillcrest Dr, DeSoto MO 63020. Anticipated Scope of Work and Service: Option 1: Provide all necessary materials, labor, and equipment to complete installation of new asphalt shingles on the living quarters and ambulance bay according to the following scope: o Removal and disposal of the existing roofing materials. Strip roof to bare wood. o Inspection and repair of the roof deck, re-nail existing plywood or other boards where needed. o Replace existing plywood as needed. o Apply two courses of ice and water shield up from the eaves of roof and valleys. o Apply new flashing / boots to all pipes, penetrations, and necessary areas. o Repair / replace drip edge as needed or where missing. o Cover the remaining roof with high performance felt paper. o Apply Owens Corning TruDefinition Estate Gray Laminated Architectural Roof Shingles to roof. o Installation shall be completed in accordance with the manufacturer's written instructions for all materials. o The contractor shall provide all related materials and labor required to complete specified roofing necessary to receive specified manufacturer's warranty. o The contractor shall keep work area neat at the end of each workday and contained through the duration of the job. o Comprehensive cleanup and removal of debris upon project completion. o 24-hour access is required to the garage and living quarters. Crews must be able to enter and exit the living quarters and ambulance garage at all times. Ambulances must be able to enter and exit the garage at all times. Option 2: Provide all necessary materials, labor, and equipment to complete the installation of a new complete standing seam metal roof system on the living quarters and ambulance bay according to the following scope: o Removal and disposal of the existing roofing materials. Strip roof to bare wood. o Inspection and repair of the roof deck, re-nail existing plywood or other boards where needed. o Replace existing plywood as needed. o Apply two courses of ice and water shield up from the eaves of roof and valleys. o Apply new flashing / boots to all pipes, penetrations, and necessary areas. o Repair / replace drip edge as needed or where missing. o Cover the remaining roof with high performance felt paper or other underlayment as recommended by the metal roof manufacturer. o Install high-quality metal standing seam roofing system meeting or exceeding all industry standards and local building codes in color chosen by District to roof. Roofing system shall include but not be limited to underlayment, metal panels, flashing, ridge cap, fasteners, sealants, trim, ventilation, and all other components to provide a complete water tight roofing system. o Color options must be submitted to Chief Jesse Barton for written approval before any materials are ordered. o Installation shall be completed in accordance with the manufacturer's written instructions for all materials. o The contractor shall provide all related materials and labor required to complete specified roofing necessary to receive specified manufacturer's warranty. o The contractor shall keep work area neat at the end of each workday and contained through the duration of the job. o Comprehensive cleanup and removal of debris upon project completion. o 24-hour access is required to the garage and living quarters. Crews must be able to enter and exit the living quarters and ambulance garage at all times. Ambulances must be able to enter and exit the garage at all times.

Award

Medical

$13,806.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
46
Bidding Soon
812
All Active Projects
316
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2023

July 31, 2023

img_map_placeholder

1540 Hillcrest Dr, Desoto, MO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.