Renovation of a playground / park / athletic field in McClellan, California. Completed plans call for the renovation of a playground / park / athletic field.

STATEMENT OF WORK Frost Park Repairs USCG Air Station Sacramento 1.0 GENERAL REQUIREMENTS 1.1 PROJECT DESCRIPTION During the unprecedented storms experienced in Sacramento this past winter, the unit received heavy rains & strong winds that caused significant damage to our recreation area, Frost Park. The metal roof panels of the existing pavilion structure were blown off by the winds. The current design is not suitable for the extreme winds received at the airfield. The support structure is failing and made from wood which is aged and suffering from dry rot. Last known repairs to the structure date back to 2008. Replacing this wood pavilion section with a covered aluminum or comparable structure will prove to withstand the extreme temperatures and high winds throughout the year. Area of structure in need of replacing is approximately 14 ft x 35 ft & 13 ft x 24 ft and will need to be tied into the center pavilion structure. 1.1.1 Technical Point of Contact (POC): LT JAMES DUHAMEL (774) 303-0798 MKC ART CASTANEDA (626) 497- 6000 1.2 LOCATION 1.2.1 Work to be conducted at USCG Air Station Sacramento. 6037 Price Ave McClellan, CA 95652 1.3 AIR STATION AND LOCAL REGULATIONS 1.3.1 The work site is on Government property. All rules and regulations issued by the Commanding Officer covering safety, vehicle operation, and sanitation must be observed by the Contractor and their employees at all times. 1.3.2 All personnel employed on site shall keep within the limits of the work and shall not enter any restricted area unless required or escort by a unit member. The Contractor's equipment shall be conspicuously marked for identification. 1.3.3 The Contractor shall control its employee's traffic on site. Parking for workers shall be at a suitable location as directed by the Technical POC. 1.3.4 The Contractor shall coordinate work with the technical POC to minimize any disruption to normal unit operations. 1.3.5 Unit is available for site visits, 0730-1400 Monday-Friday, through prior coordination with POC. 1.4 DAMAGE TO GOVERNMENT PROPERTY 1.4.1 Any damage caused to Government or private property shall be corrected at the Contractor's expense. 1.5 SAFETY AND SECURITY 1.5.1 The Contractor shall provide all necessary safety equipment to protect the work site area. All work shall be performed in accordance with O.S.H.A. Safety standards to prevent injury to by-passers or workforce. 1.5.2 Contractor shall comply with Federal and State of California safety and health regulations. When standards differ, the more stringent shall apply. All accidents and property damage shall be reported to the Technical POC. 1.5.3 The Contractor shall be responsible for the security of their material, tools and equipment. The Government shall not be responsible for their loss. 1.5.4 The Contractor shall comply with all rules and regulations issued by the National Fire Protection Association covering the use and storage of flammable mixtures or material which might constitute a fire hazard. 2.0 EQUIPMENT 2.1 Contractor shall provide whatever equipment necessary to complete the work outlined in the scope, along with post installation inspection. 3.0 SCOPE OF WORK 3.1 Provide all labor, equipment, and materials to complete the pavilion structure construction to include: 1. Lock-Out/Tag-Out of any existing power sources. 2. Engineer & design custom patio structure for commercial specifications. 3. Construct and install new patio structure. 4. Secure support posts to concrete foundation. 5. Tie-in new structure to existing center pavilion. 6. Dispose of any materials used or removed from the system. 3.2 The unit will perform the demolition of the existing structure prior to contract work commencing. 3.3 Services shall be accomplished between the hours of 0800-1400, Monday-Friday, not to include federal holidays except as designated by the contracting officer or official representative. 3.4 The Contractor shall coordinate with the technical POC to schedule a date and time for project commencement. 3.4.1 Project is to be completed within 30 days of the contract being awarded. 3.5 The government shall use a 100% surveillance method. Inspection of work shall be performed at the time the Contractor is at the site performing its services and prior to contractor leaving the site. 3.6 The Contractor shall remove all debris, rubbish and hazardous waste from the job site. 3.7 The Contractor shall keep the Contracting Officer and /or technical POC fully informed on the daily progress of the work, from the start through completion of this inspection. 3.8 The Contractor shall be prepared to increase scope of work if issue is determined to be more extensive than originally expected. 3.9 Unsatisfactory performance shall result in work being re-accomplished at no cost to the government. 3.10 It is the contractor's responsibility to verify all measurements/dimensions listed above prior to submitting a quote/proposal. 3.11 Point of contact (POC) is LT JAMES DUHAMEL (774) 303-0798. Send all quotes to SK3 Jared Osborne Jared.A.Osborne@uscg.mil 6037 Price Ave. McClellan AFB, CA 95652 phn: (916) 643-7669

Post-Bid

Playgrounds / Parks / Athletic Fields

$250,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
40
Bidding Soon
1,400
All Active Projects
617
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2023

August 21, 2023

img_map_placeholder

6037 Price Ave, McClellan, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.