Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in McClellan, California. Contact the soliciting agency for additional information.
STATEMENT OF WORK Main Hangar Air Compressor Replacement USCG Air Station Sacramento 1.0 GENERAL REQUIREMENTS 1.1 PROJECT DESCRIPTION Main hangar reciprocating Air Compressors and dryer cannot support the demand of pneumatic equipment used by aviation personnel. The current air compressors are loud and due to the age of the units, require excessive maintenance and funding to maintain. In addition, due to the excessive heat, the units often do not operate efficiently and create excessive moisture. Switching over to rotary compressor is 25% more efficient, lowers the cost of ownership, reduces the carbon footprint, stays functional in extreme temperatures, and reduces noise level. 1.1.1 Technical Point of Contact (POC): LT JAMES DUHAMEL (774) 303-0798 MKC ART CASTANEDA (626) 497- 6000 1.2 LOCATION 1.2.1 Work to be conducted at USCG Air Station Sacramento. 6037 Price Ave McClellan, CA 95652 1.3 AIR STATION AND LOCAL REGULATIONS 1.3.1 The work site is on Government property. All rules and regulations issued by the Commanding Officer covering safety, vehicle operation, and sanitation must be always observed by the Contractor and his employees. 1.3.2 All personnel employed on site shall keep within the limits of the work and shall not enter any restricted area unless required or escort by a unit member. The Contractor's equipment shall be conspicuously marked for identification. 1.3.3 The Contractor shall control its employee's traffic on site. Parking for workers shall be at a suitable location as directed by the Technical POC. 1.3.4 The Contractor shall coordinate work with the technical POC to minimize any disruption to normal unit operations. 1.4 DAMAGE TO GOVERNMENT PROPERTY 1.4.1 Any damage caused to Government or private property shall be corrected at the Contractor's expense. 1.5 SAFETY AND SECURITY 1.5.1 The Contractor shall provide all necessary safety equipment to protect the work site area. All work shall be performed in accordance with O.S.H.A. Safety standards to prevent injury to housing occupants, by-passers, or workforce. 1.5.2 Contractor shall comply with Federal and State of California safety and health regulations. When standards differ, the more stringent shall apply. All accidents and property damage shall be reported to the Technical POC. 1.5.3 The Contractor shall be responsible for the security of their material, tools, and equipment. The Government shall not be responsible for their loss. 1.5.4 The Contractor shall comply with all rules and regulations issued by the National Fire Protection Association covering the use and storage of flammable mixtures or material which might constitute a fire hazard. 2.0 EQUIPMENT 2.1 Contractor shall provide whatever equipment necessary to complete the work outlined in the scope, along with post installation inspection. 3.0 SCOPE OF WORK 3.1 Provide all labor, equipment, and materials to complete main hangar air compressors replacement to include: 1. Lock-Out/Tag-Out of power source. 2. Remove existing air compressors using customer provided lift. 3. Place and secure new air compressors using customer provided lift. 4. Install conduit and wire from compressors to existing fused disconnect switch withing 6' of compressor. 5. Plumb from compressor discharge into existing compressed air system. 6. Plumb condensate line to suitable drain point or OWS. 7. Perform factory start-up. 8. Dispose of any materials used or removed from the system. 3.2 Contractor shall do a complete inspection and test, checking for proper operation. 3.3 Services shall be accomplished between the hours of 0730-1530, Monday-Friday, not to include federal holidays except as designated by the contracting officer or official representative. 3.4 The Contractor shall coordinate with the technical POC to schedule a date and time for project commencement. 3.4.1 Project is to be completed within 07 days of the contract being awarded. 3.5 The government shall use a 100% surveillance method. Inspection of work shall be performed at the time the Contractor is at the site performing its services and prior to contractor leaving the site. 3.6 The Contractor shall remove all debris, rubbish, and hazardous waste from the job site. 3.7 The Contractor shall keep the Contracting Officer and /or technical POC fully informed on the daily progress of the work, from the start through completion of this inspection. 3.8 The Contractor shall be prepared to increase scope of work if issue is determined to be more extensive than originally expected. 3.9 Unsatisfactory performance shall result in work being re-accomplished at no cost to the government. 3.10 It is the contractor's responsibility to verify all measurements/dimensions listed above prior to submitting a quote/proposal. 3.11 Point of contact is MKC ARTHUR CASTANEDA (626) 497-6000. ALL QUOTES MUST BE SENT ONLY TO Gary.C.Agan@uscg.mil (916) 643-7678 Christopher.a.bahn@uscg.mil 916 643 7674
Post-Bid
Military
Public - Federal
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 22, 2023
August 22, 2023
6037 Price Ave, McClellan, CA
Related To This Project
McClellan, CA
Bid Date: Jul 25 2023
McClellan, CA
Bid Date: Aug 14 2023
McClellan, CA
Bid Date: Jan 14 2022
McClellan, CA
Bid Date: Dec 22 2021
McClellan, CA
Bid Date: Feb 09 2022
McClellan, CA
Bid Date: Sep 09 2019
McClellan, CA
Bid Date: Oct 01 2023
McClellan, CA
Bid Date: Oct 05 2023
McClellan, CA
Bid Date: Jul 21 2023
McClellan, CA
Bid Date: Jul 21 2023
McClellan, CA
Bid Date: Jun 15 2023
McClellan, CA
Bid Date: May 25 2023
McClellan, CA
Bid Date: Aug 10 2023
McClellan, CA
Bid Date: Apr 15 2021
McClellan, CA
Bid Date: Oct 17 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.