BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in West Palm Beach, Florida. Contact the soliciting agency for additional information.

All questions are due in writing by Monday, July 24, 2023. All questions during bidding must be submitted in writing to Destime@pbcwater.com. When questions raised are deemed appropriate by the Engineer, they shall be answered in the form of Addenda. All Addenda issued shall become part of the Contract Documents. To receive consideration, such questions shall be submitted in writing to the Engineer no less than ten (10) calendar days before the established date for receipt of Bids. The Bidder shall acknowledge receipt of all Addenda on Bid Form3. Each bidder is responsible for necessary site investigations to determine all conditions and facilities needed to execute the work in accordance with the Contract documents for each Work Order. The Affirmative Procurement Initiative (API) approved for this project by the Goal Setting Committee is a mandatory minimum of 20% participation, See EBO Ordinance Section 2-80.27(1)(c), of which 3% shall be among certified African American and/or Hispanic American owned firms, See EBO Ordinance Section 2-80.27(2)(b). If the Contract is to be awarded, the Owner will give the successful Bidder a notification letter within ninety (90) days after the date of the Bid opening. Contract Times Starts: 12/19/2023 (tentative) Contract Times Ends: 12/18/2026 (tentative) Liquidated Damages: The Contractor shall pay the Owner $500.00 for each calendar day that expires after the time specified for Substantial Completion and $250.00 for each calendar day beyond the date of Final Completion. A Bid Bond, in the form of a Money Order or Certified Cashier's Check in the amount of 5% of the base bid must be submitted with the bid. The bidders must utilize the Bid Bond form provided in the Contract Documents. This pre-bid meeting has been scheduled to acquaint the prime contractors and others with the bid documents for the 2023 Lift Station Rehabilitation Continuing Construction Contract (PBCWUD No. 23-031). Palm Beach County Water Utilities Department (PBCWUD) is the Owner. The Contract will include a series of separate Work Orders all related to utility lift station projects. Engineer's cost estimate is $16,200,000.00 for construction services. The Contract is for a two-year (24-month) term with an optional one (1) 12-month contract renewal. The County has no obligation to issue any work under this Contract. The bids will be for furnishing all materials, labor, supervision, equipment, supplies, fees, expertise, and services necessary for the rehabilitation of wastewater submersible lift stations, including but not limited to, wetwell, valve vault and manhole repairs/replacements, emergency by-pass, force main and gravity sewer installation and all associated appurtenances, control panel/RTU installation/replacement, electrical conduit installation. The Contract will be awarded to up to two (2) of the lowest responsive and responsible bidder(s).

Award

Water / Sewer

$13,686,110.00

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
276
Active Projects
134
Bidding Soon
1,952
All Active Projects
846
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 2, 2023

December 19, 2023

December 18, 2026

img_map_placeholder

Multiple Locations, West Palm Beach, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.