BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 25, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a civil project in New Bedford, Massachusetts. Completed plans call for site work for a road / highway; and water / sewer project.

Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The City of New Bedford is soliciting sealed bids for the Grape Street Sewer Collector Rehabilitation Project. Bid documents can be found on the City's website under the Purchasing page. Questions related to the project shall be submitted in email to purchasing@newbedford-ma.gov and Jesse Herman of CDM Smith at hermanjd@cdmsmith.com. Question Deadline 08/07/2023 The work within this project includes, but is not limited to, installation of cured-in-place pipe (CIPP) liner for existing gravity sewers ranging in diameter from 8-inch to 36-inch, joint testing and sealing of lateral sewer connections along CIPP-lined sewers, chemical root treatment within 18-inch and 36-inch gravity sewer mains; replacement of a precast concrete sewer manhole, installation of temporary and permanent paving, and maintenance of existing flows. In addition, this project includes manhole rehabilitation, such as cleaning and monolithic lining; installation of flexible chimney seals; sealing active leaks; replacing existing manhole frames and covers; installation of polyethylene inflow prevention inserts; and all other related and incidental work required and as specified for successful completion of the project. The Commonwealth of Massachusetts goals for this project are a minimum of 4.2 percent D/MBE participation and 4.5 percent D/ WBE participation by certified DBEs. The City of New Bedford goals for this project are a minimum of 11.00 percent D/MBE participation and 5.00 percent D/WBE participation by certified DBEs. The higher of the two DBE participation goals shall govern. The City of New Bedford also has minimum goals for employment (workforce utilization) of 18.00% minority and 6.90% female participation

Bid Results

Water / Sewer

$994,994.00

Public - City

Site Work

11

14

5

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
454
Active Projects
96
Bidding Soon
3,337
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 17, 2023

September 18, 2023

Project location map

Grape St, New Bedford, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.