BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an office development in Calera, Alabama. Completed plans call for the renovation of a office development.

THE SOLICITATION IS EXTENDED TO 08/25/2023 AT 2:00PM MST/MDT TO ALLOW ADDITIONAL TIME FOR SITE VISITS AND QUOTE SUBMISSION. Construction Project - Non-personal services for bathroom and breakroom/kitchen renovations for the National Weather Service (NWS), Birmingham and Knoxville Weather Forecast Offices (WFO) located in Calera, AL and Morristown, TN per the attached Statement of Work. Total Small Business Set-Aside per FAR Part 13 under the Simplified Acquisition Threshold (SAT). Firm Fixed-Price contract will be awarded per the Trade-Off criteria in CAR 1352.213-70. See the attached full Construction Clauses and Provisions with all terms and conditions which all vendors must be in compliance with to be eligible for award. New contract, no incumbent. LEVEL OF MAGNITUDE Between $25,000 and $100,000 BONDING/LOC WILL BE REQUIRED UNLESS YOUR QUOTE IS UNDER $35K. PERIOD OF PERFORMANCE Work completed no later than 120 days after notice to proceed, quotes must provide confirmation they can fulfill this requirement. PLACE OF PERFORMANCE: BMX - WFO Birmingham 465 Weathervane Road Calera, AL 35040 MRX - WFO Knoxville 3874 Commerce Blvd. Morristown, TN 37814 THE FOLLOWING GENERAL DECISIONS WILL BE INCORPORATED AND MAY BE VIEWED AT WWW.SAM.GOV AL20230096 Dated 01/27/2023 TN20230179 Dated 05/12/2023 CAR 1352.215-72 INQUIRIES (APR 2010) Offerors must submit all questions concerning this solicitation in writing to Stephanie.Long@noaa.gov. Questions should be received no later than 12:00pm MT on July 25, 2023. Any responses to questions will be made in writing, without identification of the questioner, and will be included in an amendment to the solicitation. Even if provided in other form, only the question responses included in the amendment to the solicitation will govern performance of the contract. (End of Provision) FAR 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. (b) Site visits may be arranged during normal duty hours by contacting: Birmingham WFO: Knoxville WFO: Mike Festino - Birmingham, AL Allen Adkins - Morristown, TN 205-664-5648 EXT 260 423-586-3771 EXT 260 michael.festino@noaa.gov allen.adkins@noaa.gov (End of provision) A site visit is highly recommended but not required. Vendors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. THE GOVERNMENT DOES NOT ACCEPT RESPONSIBILITY FOR NON-RECEIPT OF QUOTES. IT IS THE CONTRACTORS RESPONSIBILITY TO REQUEST AND RECEIVE A CONFIRMATION OF QUOTE RECEIPT. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Restrooms - Men and Women o Remove and replace restroom stall hardware & wall partitions for each restroom with new solid plastic wall partitions. o Replace 2 ea. counter vanities with new sinks and faucets. Counter top and side border colors to match Kitchen - Employee Breakroom. o Clean and paint steel cleanout boxes. o Clean and prep walls for painting. o Install 2 ea toilets and 1 ea urinal which are ADA-compliant, Elongated toilets 17-19" seat height models. Urinals also have ADA requirement of 13.5" min. depth and 17" max. rim height above FF. o Prep and paint all walls, and door jambs using two coats of interior Satin paint. Color will be decided later. o Clean floor and grout joints and buff tile floor. 2. Kitchen - Employee Breakroom. o Clean, prime and paint metal lockers, inside and out. o Remove all cabinets, countertops, sink and faucet. o Install new custom wood cabinets. Configuration to be determined. Prototype pictures attached at the end of the SOW. o Install new quartz countertops, and quartz backsplash o Install new tile backsplash on wall behind sink, to the cabinets. o Install new LED under counter lights, over sink and counter. o Install new matching lower cabinets and counter top on wall opposite lockers to give the room a wrap around effect. Lazy Susan cabinet to be installed in corner if possible. o Install new 30" undermount stainless sink and tall faucet. o Relocate existing outlet for refrigerator to new location where refrigerator will be. o Install new waterline to appropriate location for refrigerator and coffee area. o Install new replaceable cannister style water filter under new sink. o Remove existing wall covering. Seal, prime and apply two coats of paint to walls, jambs, doors and ceiling. Colors decided later. o Install new ceramic tile and ceramic baseboard on floor. o Clean floor, grout joints and seal tile floor.

Post-Bid

Office

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
33
Bidding Soon
618
All Active Projects
246
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2023

September 29, 2023

img_map_placeholder

Multiple Locations, Calera, AL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.