EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 16, 2023 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a warehouse / distribution facility in Dubois, Pennsylvania. Completed plans call for the construction of a 1,384-square-foot warehouse / distribution facility; and for site work for a warehouse / distribution facility.

The Pennsylvania Game Commission (PGC) is soliciting electronic Bids for a new PGC Storage/Research building to be used for office space, research and the storage of equipment The scope of the project includes the construction of a 32' x 50' pole building and attached 12' x 32' covered canopy with all framing, installation of metal siding and roof panels, concrete floor, insulation, interior wall finishes with FRP and metal, installation of garage & man doors, installation of windows and other building appurtenances. In Accordance With the Separation Act (P.l. 155, May 1, 1913), Separate Bids Are Required and Shall Be Submitted for the Following Construction Contracts: Contract No. 1 - General Contract No. 2 -Mechanical Contract No. 3 - Plumbing Contract No. 4 - Electrical When bidding, amount Bid should be in dollars and cents-no fractions of a cent will be accepted. Questions concerning project specifications and requirements should be directed to Matthew Spotts (PGC Engineering Division) by phone at 717-787-4250 Ext. 73614 or by email: matspotts@pa.gov. Any questions concerning completion of the electronic Bid should be directed to the PGC Contracts and Procurement Division at 717-787-6594 Duration: Upon award through 6/30/2024 An alternate Contact is Game Lands Maintenance Supervisor Mr. Patrick Donahue. To contact Mr. Donahue, please call the SGL #331 crew building at 814-768-7818. The personnel that work in this building are frequently out in the field so please leave a message. A location map is included on the drawing. This area is not restricted, but bidders interested in viewing the site should contact Mr. Seeley or Mr. Donahue to get directions and to announce your arrival onto PGC property. Bidders shall be experienced and fully capable to perform the type and extent of Work required on this project. After Bids are opened, the PA Game Commission reserves the right to request the names and contact information from at least three (3) references for projects completed within the previous three (3) years that are similar in size and scope in order to verify experience and qualifications. Reference information shall include: Project Name, Description, and Final Cost; and Reference Name, Company, Address, and Phone No. Attached to the project listing in electronic format are this Bid Notice, Project Terms and Conditions, Specifications, and applicable Drawings / Details. These documents are all part of the electronic proposal. Bids must be submitted electronically using the SRM system and must be submitted by the Bid Opening date and time listed above. A bid guarantee or bond is not required. The Commonwealth reserves the right to reject any and all Bids, to waive technical defects in Bids and to accept or reject any part of the Bid deemed in the best interests of the Commonwealth. Except as otherwise provided by law, award will be made to the lowest responsible and responsive Bidder, and all Bidders will be advised of the Bid results. A Purchase Order will be generated at the time of award without further input from the successful Bidder. Awarded vendor will be sent a copy of this document and no work will be authorized until the vendor is in receipt of the Purchase Order. All vendors who conduct business with the Pennsylvania Game Commission must have a Vendor Number assigned to them in order to conduct business and receive payment from the Commonwealth.

Award

Warehouse / Distribution

$27,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Siding, Roof and Wall Specialties and Accessories, Roof Accessories, Snow Guards
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Wall Finishes, Special Wall Surfacing
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
97
Bidding Soon
808
All Active Projects
383
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2023

September 22, 2023

img_map_placeholder

To Be Determined, Dubois, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

New PGC Storage Research building - SGL 331 New Building

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.