BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Pagosa Springs, Colorado. Working plans call for site work for a municipal facility; road / highway; and for paving for a road / highway.

On request, and to the extent Owner has control over the Site, Owner will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid The work is for the furnishing of all labor and material for the construction of Phase 4B at the Archuleta County Landfill as generally described as follows: Phase 4B Cell construction consisting of: Stripping and stockpiling of topsoil from areas to be disturbed. Excavation and grading of landfill cells, berms, and access roads. Installation of approximately 4 acres of scarified and recompacted in-situ clay, geocomposite drainage layer, and 1-foot of protective soils. Construction of perimeter roads and ditches. Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. This Work shall be subject to minimum wages and labor standards in accordance with the State of Colorado. Archuleta County reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the Owner.

Final Planning

Municipal

$1,193,138.00

Public - County

Paving, Site Work

11

13

4

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
58
All Active Projects
30
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2023

March 11, 2024

img_map_placeholder

9179 Co Rd 500, Pagosa Springs, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.