BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2023 at 8:00 PM

Updated May 2, 2024

Site work and outdoor lighting for a road / highway in Downers Grove, Illinois. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

The work under this contract includes underpass lighting removal and installation of new LED lights, installation of new lighting controller, underpass lighting equipment upgrade, maintenance of traffic and other miscellaneous work. The work to be done under this contract shall be started on or about November 27, 2023. All work under this contract shall be completed by June 17, 2024. The location of the services to be performed for this contract is the Tri-State Tollway (1-94) Mile Post 24.9 in Lake County and Veterans Memorial Tollway (1-355) Mile Post 20.0 in DuPage County, Illinois Bidders may be required to be pre-qualified by the Illinois Department of Transportation (DOT). Veteran-Owned Small Business Program (VOSB) - 3% Workforce Equal Employment Opportunity (EEO) - 19.6% IDOT Prequalification required: Yes Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4599D.4907_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on August 14, 2023. A completed Questionnaire and a statement of current contractual obligations on forms supplied by the Illinois Tollway will be required from the apparent low bidder once the apparent low bidder is determined. Each bid must be accompanied by a Bid Guaranty in the amount of five (5%) percent of the total amount shown in the bid for the contract. The Bid Guaranty shall be in the form of an acceptable bid bond or a bank draft, certified check or cashier's check drawn on a solvent bank made payable to the Illinois State Toll Highway Authority. Award of the above contract, if any award be made, will be to the lowest responsive and responsible bidder or bidders. The Illinois Tollway reserves the right to reject any and all bids, to waive technicalities, or cancel the solicitation.

Post-Bid

Roads / Highways

$100,000.00

Public - State/Provincial

Outdoor Lighting, Site Work

71

9

14

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
453
Active Projects
244
Bidding Soon
3,322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

November 27, 2023

Project location map

Multiple Locations, Downers Grove, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.