Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 25, 2023 at 8:00 PM
Updated January 29, 2024
Renovation of a mixed-use development in Boulder, Colorado. Working plans call for the renovation of a laboratory facility.
Overall Labspace Requirements Replace all lights in space with LED lighting Non-reactive counter surfaces Epoxy floors Fire extinguishers First Aid kit Address leaks in ceiling space Ensure all construction projects have NEPA review documentation Paint walls New trim Ceiling - exposed ceiling like new CNS space Drop ceiling ethernet cables (same density as the CNS space) Drop ceiling power cables (same density as the CNS space) Increase breakers to allow more outlets in space (dependant on number of outlets and amp draw of instruments) Office space Replace all lights in space with LED lighting Demo walls and add sidelights with frosted bottoms (if money allows) Replace doors with glass doors with frosted bottoms (if money allows) Epoxy the floors Paint and add trim
Final Planning
Laboratories
$190,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
