BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Cape Canaveral, Florida. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

his basic contract SOW describes the requirements necessary to complete the design-bid-build (DBB) construction requirements for an RE&C Acquisition Task Order (TO) which describes this DBB construction effort at Cape Canaveral SFS. The RE&C Contractor is to provide the Government with a complete construction and warranty in accordance with FAR 52.246-21, for the full depth pavement replacement of the first 1,000 feet of asphalt at each end of the runway with concrete to include associated grading and drainage adjustments, with all new pavement grooves and new pavement markings. Mill and overlay the remaining internal asphalt portion of the runway with hot mix asphalt (HMA) and provide airfield markings. Repair and regrade airfield electrical and lighting systems to accommodate airfield pavement repairs. All work shall be accomplished in accordance with (IAW) the contract specifications, drawings, and as directed by the Contracting Officer (CO). The contract will include Bid Schedules A and B as shown in Appendix A, Sheet GC-002, and the associated phasing plan shown on Sheet CT-003, modified as follows. The 31 end (east end) will be displaced and reconstructed first, and the 13 end (west end) reconstructed second, prior to the completed closure for phase 3. Additionally, once Contractor completes each of the Turnarounds (Runway 31 end and Runway 13 end), the Government requires two weeks down-time to allow heavy aircraft usage of the runway. Final markings are to be applied to the ends to allow operational use of the full runway length. The Contractor shall provide two crews for this task order, one crew per location. NOTE: Only one tank may be taken out of service at a time per fuel farm area for repairs unless otherwise authorized with the base fuels team. The Contractor shall repair deficiencies at fuel tanks and facilities listed in Table 1. The API 653 report and repair scope are provided for bidding purposes. The repair scope contains the only repairs that have been approved by DLA and stakeholders and may differ from the API 653 report. The contractor shall repair only the deficiencies specified in this SOW. The Contractor shall provide shop drawings to the level of effort indicated (Appendix A, 4.0 Repair Requirements for Specific Tanks), for repairs or new construction, for the deficiencies. The Contractor shall provide all incidentals required to complete the shop drawings for repairs needed for complete and usable facilities. Cape Canaveral SFS, F Estimate $25-100 Million

Post-Bid

Transportation Terminals

$10,000,000.00

Public - Federal

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
108
Bidding Soon
1,659
All Active Projects
673
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 14, 2023

January 9, 2024

img_map_placeholder

To Be Determined, Cape Canaveral, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.