BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a museum in Triangle, Virginia. Completed plans call for the renovation of a museum.

NMMC Korean War Gallery updates. See soliciation for full details. Open since November 10, 2006, the National Museum of the Marine Corps (NMMC), located at 1775 Semper Fidelis Way, Triangle, VA 22172, is a military history museum dedicated to showcasing the material history of the United States Marine Corps (USMC). Each gallery within the museum portrays the history of the Marine Corps through a complex integration of artifacts, graphics, audio and video media, theatrical lighting, life cast figures, interactive displays, scenic tableaus, and dioramas. The museum's Korean War Gallery, otherwise referred to as Gallery 11, is an 8,000 square foot gallery within the museum that conveys the history of the Marine Corps from 1950 to 1953. This is a Performance Work Statement (PWS) for the fabrication and installation of the National Museum of the Marine Corps' Korean War Gallery Updates. Within this document the terms NMMC, Government, and Museum are used interchangeably. The Museum is seeking a vendor to fabricate and install exhibit partitions, graphics, scenic treatments, lighting, artifact display cases, and artifact mounts as a part of a small-scale exhibit redesign in the existing Korean War Gallery (Gallery 11). The vendor will be required to perform modifications to existing exhibit structures, to remove an existing artifact case, fabricate new permanent exhibit partitions, and conduct licensed electrical work to install suitable artifact case & wall lighting. Prospective vendors will be required to conduct a site visit to consult with Marine Corps staff prior to the beginning of any fabrication work. An industry day will be held for interested vendors to answer any questions not covered in this document. Included along with this PWS are several relevant Attachments and a PDF of the Korean War Gallery Update drawing set. Please use this document and the various attachments to compile your quote. 2. SCOPE OF PRODUCTION & DETAILS: The following sections detail the elements of the Korean War Gallery Update, and define the specific production requirements for each. A. DEMOLITION & REMOVAL OF EXISTING ELEMENTS Removal of existing lighting fixtures, track & support arms The vendor will be responsible for the removal of the pre-existing lighting structure that will be re-utilized for the lighting of the new partitions. The existing wall surfaces are lit by LED fixtures powered by a run of energized track. The vendor will be required to provide a licensed electrician to de-energize the track, and relocate the electrical infrastructure required to re-energize the track in the new location (a few feet away.) The vendor will be responsible for the re-installation of the support arms, track, and fixtures. Details on the existing lighting system can be found in Attachment H, drawing sheet iX11-06.

Post-Bid

Museum

$150,000.00

Public - Federal

Renovation

22

3

23

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
83
Bidding Soon
2,006
All Active Projects
795
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2023

September 18, 2023

img_map_placeholder

1775 Semper Fidelis Wy, Triangle, VA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.