BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a mixed-use development in Stanwood, Washington. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of April 24, 2026 project was awarded to Konnerup Construction Inc., awarded amount is $584,057.90. The 272nd St Nw Thud Ave Nw Sidewalk Improvement Proj Ect Consists of Cach, Gutter, Plant or Strip and Sidewalk With Storm Drainage and Treatment Akong 272ad St. Nw From 78th Ave Nw East to 72nd Ave Nw and Then North Along the Wrist Sule of 72nd Ave Nw to End of the Current Sidewalk South of Tyler P1 Nw and Along the North Side of 272nd St. Nw From the End of the Exist Ing Salewalk Oppusite 7th Ave Nw East to the West Entrance of the Parking Int of the Bob Larson Stadium. The Project Also Suludes 12 C900 Water Main Connecting Existing System on 75ml to Exist Ing System on 272nd. The Engineer's Estimate for This Project Ranges Between $700,000 to $800,000. The Proj Ecf's Physical Completion Date Shall Be Within 40 Working Days of the Notice to Proceed. Work to Begin After June 20th 2026.Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. Minority and Women Awned Hustneems Shall Be Afforded Ball Opportunity to Sadmit Láda in Response to This Invitation, Shall Not Be Discriminated Against on the Grounds of Gender, Race, Color Age National Origin or Handies Consideration of an Award of Any Contract or Subcontract, and Shall Be Actively Solicited for Participa Tion in This Project by Direct Mail Ing of the Invitation to Had to Such Iusiness as Have Contucted Thr City for Auch Notification. Further All Biblers Are Dirsetod to Solicit and Consider Minority and Women Owned Businesses as Potentaal Subcontractors and Material Sup Pliers for This Project the City of Stanwood Resorve the Right to Accept the Bid That is in the Best Interest of the City, to Postpone the Acceptance of Bids And the Award of the Contract for a Period Not to Excoed Sixty (60) Day's, or to Reject Any and All Bida Received. Subject to the Foregoing. The Bid May Be Awarded to the Lowest Responsible Bidder. When Awarded the Contract, the Staccen Ful Bidder Shall Promptly Execute the Contract and Shall Furnish a Hood of Faithful Performance of the Contract in the Full Amount of the Contract Price. Bids Must Be Sub-mitted in a Sealmd Envelope With the Outside Cinarly Marked With the Hid Opening Date, Bid Egen Ing Time, and the Project Name as It Appears in This Advertisement and the Name and Addrese of the Bidiler. Shall Be Submitted on the Prescribed Bid Forme and in the Manner as Stat Ed in This Advertisement and in the Project Mannal and Saul Buls Shall He Accompanied by a Bid Deposit in the Form of a Cashier Chenk, Pustal Money Order, or Su Ty Hand to the City of Stanwood.m the Amount of Five Perrent (%) of the Total Amount of the Had. If a Surety Bond is Used, Saad Hond Shall Be Issued by a Surety Authn Rized and Registered to Issue Said Bouds in the State of Washington the Band Shall Specify the Unioty's Name, Address, Contact and Phot Namhee, Ond Shall Include a Power of Attorney Appointing the Signato Ry of the Bond as the Person Autho Rized to Execute It. Should the S Ensaful Badder Fail to Enter Into the Contract and Furnish Satisfacto Ry Performance Bond Within the Time Stated in the Information for Badders, the Bid Deposit Shall Be Furfeited to the City of Starwood Faxed Bide and/or Surety Bonds Will Not Be Accepted *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$584,058.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
179
Bidding Soon
3,127
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.