Published September 23, 2023 at 8:00 PM

Updated November 15, 2023

Site work for a military facility in South Burlington, Vermont. Completed plans call for site work for a military facility.

Award Details Contract Award Date: Sep 22, 2023 Contract Award Number: W50S9C-23-C-0002 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: DN9VH9YLYSG3 Contractor Awarded Name: MIDWEST ELECTRICAL CONSTRUCTION INC Contractor Awarded Address: Topeka, KS 66609 USA Base and All Options Value (Total Contract Value): $2,755,000.00 The Vermont National Guard is issuing an Invitation for Bids to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the Construction to expand the photovoltaic (PV) array to include new 500 KW ground mounted PV array and 250 KW/500 KWH battery array to feed the Fire Station. Work includes underground electrical lines as needed, extension of base wide Schneider Electric EcoStructure energy management system which will manage the new power assets such as four existing roof inverters, existing generator, batteries, and solar expansion. Upgrade existing EcoStructure software suite with MicroGrid Operations module at the 158th Fighter Wing, Vermont Air National Guard Base located in South Burlington, Vermont The contract duration will be 600 calendar days after notice to proceed to include inspection and punch list. This project is set aside 100% for Small Businesses. The North American Industry Classification System (NAICS) Code is 237130, with a small business size standard of $45,000,000. The magnitude of construction is between $1,000,000 and $5,000,000. The pre-bid conference Date, Time and Location is detailed in the Section 00100 INSTRUSTIOS, CONDITIONS, AND NOTICES TO OFFERORS item #4 in the solicitation. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-bid conference. All questions for the pre-bid conference must be submitted as detailed in Item #4. The bid opening date is detailed in Block 13 of the solicitation. Interested offerors must be registered in the System for Award Management (SAM). To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration). All solicitation and associated information is available only from the Contract Opportunities page at SAM.gov. Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states "By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded". In accordance with FAR 36.211(b), the following information is provided: The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements. DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror's responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies. Schneider Electric EcoStructure Energy Management system MicroGrid Operations module is a sole source/brand name specific for compatibility with existing installation systems (noted justifications will be included with solicitation). In addition to the base work described above, the solicitation will include the following option line items: Option #1 - Add GMP recloser and Delete GMP RTU. Option #2 - Change 500 KVA Transformer to 750 KVA Transformer. Option #3 - Change PV system from 375 KWAC/ 406 KWDC to 437.5 KVAC/ 474 KWDC System. Option #4 - Change BESS from 125 KW/ 125 KWH to 250 KW/ 250 KWH Output. Option #5 - Change BESS From 125KW/125KWH to 250 KW/ 500 KWH Output. Option #6 - Add Stone/Drainage under new solar array. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Military

$2,755,000.00

Public - Federal

Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Other Specialties, Scales
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Air Cleaning Devices
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Electrical Utility Transmission and Distribution, Electrical Underground Ducts and Manholes
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
98
Bidding Soon
1,539
All Active Projects
654
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2023

October 23, 2023

img_map_placeholder

To Be Determined, South Burlington, VT


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Expand Photovoltaic (PV) Array

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.