BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a multi-residential development in Knoxville, Tennessee. Completed plans call for the construction of a 86,000-square-foot, 76-unit multi-residential development; and for site work for a multi-residential development.

“The owner has selected a Construction Manager. A timeline for construction has not yet been established.” Description: KCDC will receive proposals for Construction Management Services for the Construction of a Multifamily Housing for Western Heights Phase 1 (Vertical Construction) C24001 as detailed in the solicitation document. 1. Definitions a. Construction Manager at Risk (CMAR) is a delivery method, which includes a contractual commitment by a construction manager to deliver the specified project within a Guaranteed Maximum Price and Completion Date(s). b. "Supplier" is inclusive of various words describing interested parties often called "vendor," "bidders," "contractors" and "proposers." Consult with, advise, assist, and provide recommendations to the Project Team on all aspects of the design of the project throughout the preconstruction period. It is anticipated that there will be a minimum of two virtual meetings per month and additional time for interim meetings, emails, and phone communications. There will also be several in-person meetings at the project site during the preconstruction period. Further involvement at a lower intensity will be needed during the loan approval period and a "for construction" rebid to subcontractors will be needed in late 2023 or early 2024 during preparations for execution of the construction contract and mobilization for construction. Provide information, estimates and alternative schemes, and participate in decisions regarding existing conditions, site utilization and construction phasing. Maintain a dynamic value engineering record with inputs from all project participants and provide alternative pricing and time impact for each item. The Construction Manager will provide both Payment and Performance bonds, each equal to 100% of the construction project's cost, as a condition precedent to the award of the second phase of the contract. Documentation of bonds shall be in a format acceptable to Owner. See Exhibit B of AIA 133 for additional bonding requirements. Liquidated Damages During the construction phase, if the project reaches that level, liquidated damages for each day beyond the scheduled completion date will apply. The specific terms of the liquidated damages are further described within the contract documents. Question Deadline 08/18/2023 at 6:00 PM ET KCDC reserves the right to accept or reject and negotiate these charges

Award

Multi-Residential

$23,000,000.00

Public - City

New Construction, Site Work

239

34

2

2

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
92
Bidding Soon
846
All Active Projects
367
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 24, 2023

February 1, 2024

December 31, 2025

img_map_placeholder

1621 Jourolman Ave, Knoxville, TN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.