BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2023 at 8:00 PM

Updated June 29, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Ellensburg, Washington. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The improvement of Faust Road over the Towne Ditch, including the replacement of the existing bridge, guardrail, approaches, shoulders, installation and removal of a temporary detour, additional site grading, roadway paving and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. Est. Completion Date: April 30, 2024

Award

Bridges / Tunnels

$1,031,579.00

Public - County

Demolition, New Construction, Paving, Site Work

35

9

8

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
30
Bidding Soon
395
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 17, 2023

October 16, 2023

Project location map

Faust Rd, Ellensburg, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.