BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling and renovation of a military facility in Groton, Connecticut. Completed plans call for the remodel of a military facility.

B527, OT12 & OT13 DLA Security Lighting Installation and B549 Generator Replacement Design Build. Request for Information (RFIs): RFIs must be submitted in writing utilizing the attached RFI form (Attachment K) via email to rebecca.r.dennison.civ@us.navy.mil. An amendment will be issued with the consolidated RFIs answered. No questions will be accepted after 10AM EST on 27 July 2023. Description of Work: DLA Security Lighting at B527 and OT 12 & 13 involves the installation/ replacement of existing light fixtures mounted on B527, installation of strategically placed lighting fixtures in the vicinity of OT 12 & 13, and the installation of a permanent emergency generator at B549. The purpose of the installation is to support efficient fuel farm operations and resiliency through the use of various fixtures in order to improve upon the currently under lit areas on the sites as well as to provide a stable and reliable source of power during an outage. To support this installation, new low voltage lines will be installed at B527, B549, and in certain designated areas around OT 12 & 13. This will involve an above ground and potentially underground installation of conduit and wiring. More loads will be added to the new generator configuration involving the routing of new upgraded wiring and conduit (if necessary) at B549. An automatic transfer switch will be installed in place of the existing manual transfer switch at B549, rewired to support new emergency loads. Concrete work will occur to support the pad mounted installation of the pole light fixtures and generator. Certain landscape site improvements will occur as well, including the planting of grass, removal and replacement of ground material, and soil leveling. Demolition including removal of existing generator, its connections and existing concrete pad will occur. Performance is to take place on DLA property at Naval Submarine Base New London in Groton, CT. The project specifications are in Attachment B and NEPA in Attachment C. AR 36.204(f) Disclosure of Magnitude of Construction: Between $500,000 and $1,000,000. All work shall be completed within 365 calendar days after contract award.

Post-Bid

Military

$1,000,000.00

Public - Federal

Remodeling, Renovation

4

22

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
201
Bidding Soon
2,855
All Active Projects
1,252
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2023

October 25, 2023

img_map_placeholder

Spring St, Groton, CT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.