Renovation of a municipal facility in Manistee, Michigan. Completed plans call for the renovation of a municipal facility.

**As of September 20 2023, the project has been awarded to ElectroMedia Inc. for $28,115.40. Manistee County is requesting quotation for the installation and termination of indoor and underground single mode fiber optic cable and rack mounted fiber trays. Please submit questions and quotations to Gordon McLellan via email using the address above. September 19th: County Board will make decision to accept a proposal. Pending board approval, a purchase order will be sent before the end of September. August 14th 4:30 pm: Letter of intent due from vendors intending to bid on project. August 4st 10:00 am: Initial questions due, schedule site visits between Aug 7 and Aug 11 Fiber Cabling: Manistee County is requesting installation of 12 strand single mode plenum rated armored cable running from the MDF (data center) located on the ground floor, to each of four IDF locations that are part of the Courthouse and Government Center complex. A secondary objective of this project is a multi-strand single mode direct burial rated armored cable from the 415 3rd St location and into the Planning Building equipment room, at 395 3rd St. Manistee County will defer to the vendors preferred cable type and strand quantity for crossing between buildings. A service loop of at least 20 feet should be included at both ends of all cable runs. All cable installed in the ceiling areas should be supported by J-hooks or other existing available support structures. Fiber cabling jackets should be labeled in the MDF as to which IDF that cable runs to. The existing fiber infrastructure shall be abandoned in-place, except in areas where removal will facilitate installation of new cabling. Most work can be performed during business hours, except for concrete drilling. Drilling of walls / floors will need to be coordinated with the Courts, as the noise affects recording equipment. This work could also be preformed before or after hours, or on a weekend. This will be negotiated with the vendors during the site visit, and when the bid is accepted.

Award

Municipal

$28,115.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
15
Bidding Soon
172
All Active Projects
79
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

October 2, 2023

img_map_placeholder

415 3rd St, Manistee, MI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.