BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Moulton, Alabama. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and laboratory facility.

The work consists of the furnishing of all materials, labor, supervision, equipment, tools, and appurtenances necessary for the set up and installation of three supplemental instrument sites. There will be two Profile Module sites and one Radar Wind Profiler site. These site preparation tasks include the installation of concrete footings, installation of the data conduit, electrical panels, gates, and fencing. RFP documents are available using the following password protected link. To obtain the password please email the Procurement Official Nick Hitzler, nhitzler@anl.gov for access. https://anl.box.com/s/rsdr6ggm3q8x2jqqogzggga0x7074pix The deadline for submitting RFIs has been revised to 5:00 PM, Wednesday, 01/10/24 Tour Schedule: 9:00 am - Meet at the Courtland Square (estimate 252 College St.). 9:05 am - Drive to the Courtland site (34.654097, -87.292777) and view terrain and possible power source. 9:20 am - Questions on the Albemarle Site. 9:30 am - Drive to Double Springs. 10:30 am - Arrive at Double Springs (34.179024, -87.453122) and view terrain and possible power source. 10:50 am - Questions on the Sudduth Site. 11:00 am - Drive from Double Springs to Falkville. 12:00 am - Arrive at Falkville (34.385022, -86.927596). 12:20 am - Address Summerford Questions. 12:30 pm - Tour ends

Post-Bid

Laboratories

$250,000.00

Public - Federal

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
41
Bidding Soon
536
All Active Projects
218
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2024

February 21, 2024

img_map_placeholder

3730 AL-33, Moulton, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.