BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2023 at 8:00 PM

Updated January 27, 2024

Site work and paving for a civil project in Aurora, Colorado. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Reference Number 0000326767 Pre-Bid Meeting 08/07/2023 at 10:00 AM MT Attendance Recommended Location Microsoft Teams Event Note This event will be held online using Microsoft Teams, please use the following meeting link to join the meeting: https://teams.microsoft.com/l/meetup-join/19%3ameeting_NWE2Mzc3MDUtMTQwZS00NjM1LTg3N2UtMTJkYzE2ZGY4YmYw%40thread.v2/0 context=%7b%22Tid%22%3a%229cf07bc1-6fa2-4d49-bc93-7acced6cc8d7%22%2c%22Oid%22%3a%229ad8ca8a-2024-4f8b-a322-bb9a961df17d%22%7d Or call in (audio only) +1 720-388-8447 United States, Denver Phone Conference ID: 838 684 441# The estimated cost for this this project ranges from $1,962,654.00 to $2,239,000.00. Airport Boulevard over I-70 Approach Slab Construction/Replacement Project includes bridge and roadway approach slab replacement. The project will also include other elements required to complete the work such as construction traffic control, erosion control, and existing utility identification to prevent utility impacts. Question Deadline 08/10/2023 at 3:00 PM MT Bidders may make written inquiries concerning this ITB to obtain clarification of requirements. Written inquiries shall be emailed to: Kristin Chewiwi, Procurement Supervisor, at kchewiwi@auroragov.org, Raul Griego, Project Manager, at rgriego@auroragov.org AND Mike Mohseni, Project Manager, at mmohseni@auroragov.org. It is preferred that all inquiries be sent with the subject title: Airport Blvd over I70 Bridge (5945A). Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % - Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond, payable to the City of Aurora in an amount of not less than five percent (5%) of the amount of the Bid. Original bid bond does not have to be delivered to the City; however, each bidder should maintain the original on file should the City request it at a later time.

Post-Bid

Bridges / Tunnels

$2,239,000.00

Public - City

Paving, Site Work

10

14

2

7

Subscribe For Documents

82 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
83
Bidding Soon
1,315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2023

September 1, 2023

Project location map

I-70, Aurora, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.