BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Gunnison, Colorado. Completed plans call for site work for a water / sewer project.

Service Start : 7/7/2023 Service End : 12/31/2024 PMAA, 5716, DEER LAKES DAM REHAB CONSTRUCTION C24DM6.CAPTIAL CONSTRUCTION TO BE SOLICITED VIA IFB FOR DAM REHABILITATION. Contractor Questions: All questions related to the project shall be submitted via e-mail to the Project Manager at jenna.svoboda@state.co.us. The deadline for questions is 08.16.2023 at 11:59pm. Questions submitted after the deadline will not be addressed. All questions and answers will be posted as solicitation amendments on the Vendor Self Service (VSS) website. Bidders may not automatically be notified of the existence of a modification or addendum. It is the responsibility of the bidder to check the VSS website periodically to see if any modifications have been issued. Failure to retrieve such modifications and include their provisions in your bid response may result in your bid being deemed non-responsive. The Colorado Division of Parks and Wildlife is accepting sealed bids for Rehabilitation of Deer Creek Dam #1, #2, #3, & #4.A five-percent (5%) Bid Bond, certified check, or cashier's check is required with bid proposals of $50,000.00 or more. Driving Directions: Drive 9 miles southeast on State Highway 149 to Forest Road 768. Turn left on FDR 768 drive 3 miles on Forest Road 788 to Forest Road 458. Turn left on FDR 458 and drive 2 miles. Project Coordinates: Latitude: 38 1'19.50"N Longitude: 10711'16.77"W. NOTICE OF AWARD 09.04.2023 NOTICE TO PROCEED 09.22.2023 SUBSTANTIAL COMPLETION 12.20.2023 IFB1: 2024*20 Project Location: Deer Lakes Recreation Area Grand Mesa, Uncompagre, & Gunnison National Forest Hinsdale County, CO Question Deadline 08/16/2023 at 11:59 AM MT All questions related to the project shall be submitted via e-mail to the Project Manager at jenna.svoboda@state.co.us. Rehabilitation of Deer Creek Dams reservoirs 1, 2 and 4. Dam 1: Work will abandon dam 1. The work will include stabilizing the breach and original spillway channel. Original spillway is plugged with Beaver debris and silted. Improved spillway channel will be armored with riprap harvested onsite. Dam 2: Includes work to replace 48" CMP culvert with a 48" HDPE culvert. Scope includes removing and replacing upstream dam embankment rip rap, placing geotextile below riprap and replacing onsite riprap material (Embankment Armor). Dan 3: Includes work to armor the embankment with geotextile and removed/replaced riprap. Dam 4: Work includes upstream dam Embankment Armor similar to Dam 2. Work also includes construction of new outlet structure to maintain flow at a set elevation and improvement to the emergency spillway channel.

Award

Water / Sewer

$459,200.00

Public - State/Provincial

Site Work

17

21

6

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
5
Bidding Soon
84
All Active Projects
35
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2023

September 22, 2023

img_map_placeholder

Multiple Locations, Gunnison, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.