BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Henry, Illinois. Completed plans call for the renovation of a educational facility.

HVAC upgrades in a portion of Henry-Senachwine Grade/Jr. High School, including but not limited to, installation of an air-cooled chiller adjacent to the Phase 1 chiller, removal of existing steam boiler/steam heat exchanger and installation of two condensing boilers/associated pumps, removal of steam heating/DX cooling unit ventilators/condensing units and installation of hot water/chilled water unit ventilators, installation of gas-fired/DX rooftop units in areas not served by unit ventilators, related piping/electrical/structural revisions as required to complete system, installation of building automation system, commissioning of new equipment and building envelope air infiltration improvements inside of exterior soffits. Contract Type: Single prime lump sum contract. Stipulations: Bidder will be required to provide Bid Security in the amount of not less than five percent (5%) of the base bid amount proposed, in the form of a certified check or cashier's check made payable to the Owner, or a Bid Bond. The successful Bidder will be required to furnish and pay for a satisfactory Performance and Payment Bond in the full amount of the contract. The successful Bidder shall be required to comply with all provisions of the acts of the General Assembly of the State of Illinois related to Wage Rates, Discrimination, Sexual Harassment, Alcohol Use, Preference to Illinois Workmen, Fair Employment Practices Commission, and Equal Employment Opportunity. The successful Bidder will be required to furnish and pay for a criminal background investigation for all employees involved in the project. The background investigation will consist of two parts, as follows: Part 1: Completion of a "Uniform Conviction Information Act Name Inquiry" with the Illinois State Police for each employee. Part 2: Completion of the "Criminal Background Certification" form included in Project Manual (Section 00 43 00) for each employee. The successful Bidder will be required to comply with Substance Abuse Prevention on Public Works Act (Public Act 95-0635). The successful Bidder shall not pay less than the prevailing rates of wages as determined by the Illinois Department of Labor to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Prevailing Wage Act (820 ILCS 130/1-12). All Contractor's bonds shall include a provision that will guarantee the faithful performance of such prevailing wage clause as provided by this bid specification or contract. No Illinois O.E. sales tax will be required for this work. Additional information and bidder requirements are included in the Instructions to Bidders and the Bid Documents. Owner reserves the right to reject any and all Bids, to waive any irregularities in the Bidding and to award contract in Owner's best interests. Prospective bidders and sub-bidders requiring clarifications or interpretations of the Bidding Documents shall make requests for such as early in the bidding period as possible. Last day for questions will be Thursday, September 7, 2023 (12:00 P.M. local time). C. Required interpretations, clarifications, corrections, or modifications of the Bidding Documents will be made by Addendum. Such information provided in any other manner will not be binding upon the Architect or the Owner. Last day for issuing and addendum will be Monday, September 11, 2023 (12:00 P.M. local time).

Award

Educational

$2,737,000.00

Public - City

Renovation

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
63
Bidding Soon
994
All Active Projects
463
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2023

September 21, 2023

img_map_placeholder

201 Richard St, Henry, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.