BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Peoria, Illinois. Contact the soliciting agency for additional information.

The Complexity Factor for this project is 0. This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. Phase I/II/III engineering services are required for work on various projects associated with maintenance services within District Four. The Consultant will provide Project Management services to develop the maintenance-related projects for the Bureau of Operations associated with a variety of available funds including Contract Maintenance, Day Labor, Bridge Washing, Bridge Painting, and Vegetation Control. The District’s annual maintenance services projects average approximately $8,000,000. Typical projects may include pavement patching, longitudinal joint repair, intermittent pavement resurfacing, culvert repair/replacement, pavement patching, storm sewer repairs, interstate I-74 landscape maintenance, pavement markings, guardrail repairs, shoulder repairs, slope repairs, drainage repairs, bridge painting, bridge washing, distressed tree removal, weed spraying, and others as funds become available to the District. Phase I and Phase II work may consist of data collection, topo surveys, boundary surveys, analysis of existing pavements, pavement patching surveys, hydraulic analyses, crash analyses, and preparation of abbreviated Bridge Condition Reports, abbreviated Project Reports (categorical exclusion projects only), plats and legal descriptions, structure plans, roadway plans, bridge repair plans, culvert repair plans, drainage plans, underdrain installation plans, shoulder repair plans, slope repair plans, temporary and permanent erosion control plans, guardrail repair plans, landscaping plans, pavement marking plans, traffic management and staging plans, summary of quantities and schedules, status of utilities, and any other related work required to complete plans, specifications and estimates as required for submittal for a state letting. Phase III engineering services may be required for the inspection, supervision, materials certification, documentation, and field inspection for the following projects: Landscaping of I-74 in Downtown Peoria Rehabilitation of the existing sewage lagoons at the Mackinaw Dells eastbound I-74 and westbound I-74 rest areas Weed Spraying - Districtwide Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS) The method of contractor selection has not been determined at this time. IDOT - 023 - RFP- Various Phase I/II/III Projects, Various Routes, Various Counties

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
45
Bidding Soon
591
All Active Projects
251
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2024

img_map_placeholder

Multiple Locations, Peoria, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.