BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Jerseyville, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The Complexity Factor for this project is 0.035. This project requires 22% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts Phase I engineering services are required for all work associated with the preparation of preliminary engineering and environmental studies for US Route 67 from Fulkerson Drive to Crystal Lake Road in Jersey County. Currently, US Route 67 has been identified for pavement replacement in accordance with the Departments Transportation Asset Management Plan (TAMP). The proposed improvement is to replace the existing pavement while staying within the footprint of the existing roadway, where possible. This improvement may involve drainage, ADA, and minor intersection improvements. Public involvement will be required, as well as environmental studies. This work will involve all work necessary for the preparation of the Project Report, including but not limited to, environmental studies and coordination, Location Drainage Study, geometric studies, public involvement using Context Sensitive Solutions, Intersection Design Studies (IDS), traffic management plan, pickup surveys, and all other work necessary to complete Phase I and obtain Design Approval. Phase II engineering services required for this project are anticipated to include the preparation of all Plans, Specifications and Estimates (PS&E documents). This includes roadway plans, maintenance of traffic plans, culvert plans, drainage plans, storm water pollution prevention plan, erosion control plans, and traffic signal plans. Additional items include, but are not limited to, supplemental surveys, pavement design, geotechnical borings/cores and analysis, and all other necessary related work to complete Phase II for final PSE. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project The method of contractor selection has not been determined at this time. IDOT - 036 - RFQ Engineering - US Route 67 from Fulkerson Drive to Crystal Lake Road, Phase I/II Project

Conceptual

Roads / Highways

$2,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
36
Bidding Soon
769
All Active Projects
294
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2024

img_map_placeholder

Fulkerson Dr, Jerseyville, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.