BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 4, 2023 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Carbondale, Illinois. Contact the soliciting agency for additional information.

The Complexity Factor for this project is 0. This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. Phase I/II engineering services are required to for various projects throughout District Nine. Phase I work, if required, may consist of conducting route surveys, hydraulic surveys, drainage studies, hydraulic analysis, geometric studies, preparing bridge condition reports, and preparing project reports (categorical exclusion projects only). This work will include data collection, development of alignment alternatives, cost estimates, traffic management analysis, accident analysis, bridge condition reports, TS and L, and other related work and exhibits necessary to produce the Project Report, as necessary. Phase II work, if required, may consist of conducting route surveys, hydraulic analysis, geometric studies, roadway plans, highway lighting, ADA plan development, and any other related work to complete final plans, specifications, and estimates, as necessary. Projects or tasks requiring CADD are anticipated to be completed using 3D modeling utilizing Bentleys Open Roads Designer software (or equivalent) and our current CADD environment in accordance with the latest IDOT Computer Aided Design, Drafting, Modeling and Deliverables (CADD) Manual. The various proposed projects may consist of simple patching and resurfacing, bridge repair, bridge rehabilitation, bridge replacement, widening and resurfacing, and/or new roadway projects. The department will furnish the Consultant with any available as-built plans, microfilm plans, field notes, traffic data, accident statistics, agency coordination, existing right-of-way plans, aerial photos, boring logs, and other information. The Consultants work may consist of either complete projects or a portion of the total engineering required for a certain project. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project The method of contractor selection has not been determined at this time. IDOT - 038 - RFQ - Various Phase I/II Projects, Various Routes, Various Counties

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
87
Bidding Soon
1,241
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2024

Project location map

Multiple Locations, Carbondale, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.