Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 14, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Eagle, Nebraska. Completed plans call for site work for a bridge / tunnel.

The project work shall consist of furnishing all labor, materials, and equipment for the culvert improvements and bank stabilization. The major items of work consist of approximately 39 LF of wood box culvert removal, 39 LF of 60" RCP, 2 EA of 60" RC Flared End Sections, 271 TN of riprap, 50 SY of trail surfacing, 310 SY of seeding/hydromulching, 112 LF of slope wattle, and all associated removals, earthwork, and other items necessary to complete the work. Bids shall be on a Unit Price.

Award

Bridges / Tunnels

$99,111.00

Public - City

Site Work

51

17

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
64
Bidding Soon
810
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2023

November 13, 2023

Project location map

MoPac Trail E, Eagle, NE

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed