BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Winchester, Massachusetts. Completed plans call for site work for a water / sewer project.

As of September 21, 2023 project still not awarded yet. A. The scope of work specified under this project includes a precast, concrete building with footing wall foundation. The station shall need some electrical, HVAC, instrumentation/controls provisions, and site work. The station shall house a triple pump skid and associated pipe, valves, and appurtenances. Approximately 400 feet of 8-inch ductile iron water main water main will connect the station to the existing water main and replace the length of existing 6-inch diameter main in Wendell Street An additional hydrant and associated appurtenances shall also be installed at the intersection of Wendell Street and Arbor Lane. B. Once the Permanent McDonald Field Booster Pump Station and water main under this contract are installed, the existing temporary pump station shall be disconnected by the contractor. Pipes are to be abandoned in accordance with contract drawings, the pump skid and piping shall be disconnected and delivered to the Owner, the shipping container shall be delivered to the Owner, and the site shall be restored. Bid Deposits shall be submitted in the amount of 5% of the bid price. The Bid Deposit shall be made payable to the Town of Winchester and shall be either in the form of cash, certified check, treasurer's or cashier's check issued by a responsible bank or trust company, or a bid bond issued by a surety licensed to do business in the Commonwealth of Massachusetts, and shall be conditioned upon the faithful performance by the principal of the agreement contained in the bid. The Town of Winchester reserves the right to reject or approve a surety. The Bid Deposits of the three (3) lowest responsible and eligible bidders shall be retained until the execution and delivery of the Contract. The contract will be awarded to the bidder deemed by the Town of Winchester to be the lowest responsible and eligible bidder. Selection of the successful bidder will be based upon bidder qualifications, including evidence of past performance on similar projects and bid price. The Contract award is subject to the availability of funding. The successful general bidder will be required to furnish a Performance Bond and a Labor and Materials Bond, each of which shall be in the amount equal to one hundred percent (100%) of the contract price. The Town of Winchester reserves the right to reject any bid which, in its judgment, fails to meet the requirements of this Advertisement for Bids or which is incomplete, conditional, or obscure, or which contains additions or irregularities, or in which errors occur in addition to the foregoing. The Town of Winchester also reserves the right to reject any and all proposals if it deems such rejection(s) to be in the best interest of the Town. The Town of Winchester further reserves the right to waive any minor discrepancies or informalities, to permit a bidder to clarify discrepancies or to conduct discussions with all qualified bidders in any manner necessary to serve the best interests of the Town. Any fees or other expenses of the bidders associated with this Advertisement for Bid process are solely the responsibility of the bidders. The Project value is estimated to be $1,300,000. Prevailing Wages, as determined under M.G.L. c. 149, 26 27H shall apply on this project. Materials, equipment and supplies used on this project are exempt from sales tax to the extent provided by M.G.L. c. 64H, 6(f). The date of commencement of the Contract shall be approximately September 5, 2023, unless otherwise fixed in a Notice to Proceed from the Owner and to substantially complete all work for the Base Bid, exclusive warranty inspections, within 300 consecutive days of the date fixed in the "Notice to Proceed" and complete the warranty inspection within five (5) calendar days of the commencement of warranty inspection. Time is of the essence for the completion of this project. Additionally, All work shown on the drawings to install the hydrant on the corner of Wendell St & Arbor Lane must be complete by November 15, 2023.

Bid Results

Water / Sewer

$1,194,325.00

Public - City

Site Work

13

16

7

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
221
Bidding Soon
2,770
All Active Projects
1,242
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2023

September 5, 2023

img_map_placeholder

Wendell St, Winchester, MA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.