BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction and addition to an educational facility in Hillsboro, Illinois. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.

The work consists of the construction of approximately 72,000 square feet of additions to Hillsboro High School, constructed in two distinct additions; classroom addition between existing buildings and gymnasium addition to the south of the existing gymnasium. Building construction consists of concrete footings / foundations and concrete slabs on grade / elevated slabs. The structure of the buildings consists of load bearing masonry and steel frame. Interior finishes include stained concrete slabs, vinyl tile and carpet tile flooring; masonry and metal stud / gypsum board partitions; and suspended gypsum board and acoustical panel ceilings. Roofing consists of membrane roofing and standing seam metal roofing over steel decking over steel structure. Exterior finishes include brick, metal siding and limited exterior insulation finish system. Fire protection, mechanical, electrical, plumbing, telecommunication and fire alarm work is commensurate with the scope. Site work and utility work is commensurate with the scope and includes asphalt parking lots, concrete sidewalks, and various improvements to existing surfaces. Demolition of the existing gymnasium lobby is included, and the work is to be completed early in the project. Demolition of the existing concessions building, and Main Building is included in the work and is to be completed near the end of the project. ALTERNATE BID #1: Provide and install telescoping gymnasium bleachers as indicated on Drawings and specified herein. Provide and install locker room lockers and benches as indicated on Drawings and specified herein. Note that corridor lockers are a part of the base bid. ALTERNATE BID #2: Provide and install plastic laminate casework and countertops in standard classrooms as indicated on the Drawings and specified herein. Note that additional plastic laminate casework and countertops are a part of the base bid. Provide and install fixed lecture hall seating as indicated on the Drawings and specified herein. ALTERNATE BID #3: Demolish and infill existing louvers through exterior wall & provide and install horizontal metal wall panels as indicated on the Drawings and specified herein. Note additional horizontal metal wall panels are a part of the base bid. Replace base bid exposed fastener vertical metal wall panels with concealed fastener vertical metal wall panels as indicated on Drawings and specified herein. Note additional concealed fastener vertical metal wall panels are a part of the base bid. The successful bidder shall enter into the Project Labor Agreement (Section 00 52 15 of the Contract Documents) with the Southwestern Illinois Building Trades Council (SIBTC) and their affiliated local craft unions, for all work as included within these drawings and specifications as a condition of being awarded a contract resulting from this solicitation. Any levels of Subcontractors shall enter into the same Project Labor Agreement. The Owner requires the new building construction, access to new building construction and interior renovation work to be substantially complete by April 11, 2025. The Owner requires the demolition of the existing Main Building and final site work to be substantially complete by September 26, 2025. See Drawings for other suggested phasing information. Bidders will be required to provide Bid security of a sum no less than 10 percent of the Bid Sum. The bid security shall be either certified check, cashier's check, bank money order or bid bond issued by surety licensed to conduct business in the State of Illinois. Hereinafter this bid security shall be referred to as the bid bond. Submit two copies of your Bid on the Bid Form provided. Bidders may supplement this form as appropriate. Your Bid will be required to be submitted under a condition of irrevocability for a period of 30 days after submission. The Owner reserves the right to accept or reject any or all Bids or any part thereof, to waive any informality in bidding, and to accept bids deemed most favorable to the Owner. : The work consists of the construction of approximately 72,000 square feet of additions to Hillsboro High School, constructed in two distinct additions; classroom addition between existing buildings and gymnasium addition to the south of the existing gymnasium. Building construction consists of concrete footings / foundations and concrete slabs on grade / elevated slabs. The structure of the buildings consists of load bearing masonry and steel frame. Interior finishes include stained concrete slabs, vinyl tile and carpet tile flooring; masonry and metal stud / gypsum board partitions; and suspended gypsum board and acoustical panel ceilings. Roofing consists of membrane roofing and standing seam metal roofing over steel decking over steel structure. Exterior finishes include brick, metal siding and limited exterior insulation finish system. Fire protection, mechanical, electrical, plumbing, telecommunication and fire alarm work is commensurate with the scope. Site work and utility work is commensurate with the scope and includes asphalt parking lots, concrete sidewalks, and various improvements to existing surfaces. Demolition of the existing gymnasium lobby is included, and the work is to be completed early in the project. Demolition of the existing concessions building, and Main Building is included in the work and is to be completed near the end of the project . All questions must be submitted on the "Request for Interpretation Pre-Bid Question and Comment Form"included at the end of this section, and questions not submitted in accordance with this form and specified time frame will not be accepted. Questions shall be directed to: E-mail: tdownen@hurst-rosche.com

Bid Results

Educational

$27,355,480.00

Public - City

Addition, Demolition, New Construction, Site Work

271

29

79

9

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
99
Bidding Soon
1,464
All Active Projects
640
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 14, 2023

October 9, 2023

September 26, 2025

img_map_placeholder

522 E Tremont St, Hillsboro, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.