BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 15, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a road / highway in Andover, Massachusetts. Completed plans call for site work for a road / highway.

Item 1 - Paint - K5 Corporation - $ 79,030 Item 2 - Epoxy - K5 Corporation - $ 380,400 Item 3 - Thermoplastic - K5 Corporation - $ 24,125 Painting of Road Markings A Payment Bond will be required if contract value is greater than $25,000.00 No pre-bid conference or site visit is scheduled. The Contract resulting from this bid shall be for a period starting August September 1, 2023 through June 30, 2024. However, at the end of that time this contract may be extended at the discretion of the Town of Andover, for one (2) additional one (1) year extension beginning on July 1, 2024 ending in June 30, 2025 and July 1, 2025 ending in June 30, 2026.

Bid Results

Roads / Highways

$483,555.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
594
Active Projects
334
Bidding Soon
4,354
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2023

September 1, 2023

Project location map

Multiple Locations, Andover, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.