Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 11, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a road / highway in Columbus, Ohio. Working plans call for site work for a road / highway.

The 69-2 circuit is 9.7 miles long and stretches from our Jackson Pike Substation to our Southerly Substation. Some of the line has been upgraded, but 8.3 miles of this circuit still need to be reconductored with newer, larger wire to both extend the useful life of this circuit and to provide additional capacity for the expected increased loading from solar production. Other work planned on the project includes survey to determine if the existing route is the optimal alignment, pole inspections to ensure deteriorated poles are replaced, and replacement of lightning arrestors for the safety and reliability of the circuit.

Final Planning

Roads / Highways

$300,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
114
Bidding Soon
2,233
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed