BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a military facility in Lavinia, Tennessee. Completed plans call for site work for a military facility.

SCOPE OF WORK The State of Tennessee, Military Department is requesting a Contractor to install a fence around the property line according to the below scope and attached pictures. The Contractor shall provide all labor, materials and equipment to complete job as specified below. Bid Price shall include all materials, equipment, and labor. The project must be completed within 6 Months once issued notice to proceed. Date to proceed will be determined on clearing the pathway for the fence, which is done by the customer. The State will issue a purchase order before giving notice to proceed to enable the Contractor to proceed to order supplies. Special Instructions/Fence Specs/See Attached Spec Sheets 1. Lineal Feet of Chain Link Fence- 15,488 LF /See SPEC Sheet #1 2. Height of Fence-6'+1' of barb wire 3. Type of Wire/Fabric-9 Gauge (.148) 1.2oz galvanize coating 4. Size/Weight of Braces-1 5/8" ss40 (1.83 Lbs. Per Foot) 5. Top Rail - none 6. Size & Weight of Line Post-2" od X 8' ss40 (2.28 Lbs. Per Foot) 7. Line Posts Footings-9" X 30" 8. Size & Weight of Corner Posts-2 7/8" od X 9' ss40 (4.64 Lbs. Per Foot) 9. Corner Post Footings-12" X 36" 10. Size & Weight of End Posts-2 7/8" od X 9' ss40 (4.64 Lbs. Per Foot) 11. End Posts Footings-See Attached Drawing 12. Swing Gate leaves up 8' - Size & Weight of Gate Posts-2 7/8" od X 9' ss40 (4.64 Lbs. Per Foot) 13. Gate Posts Footings-12" X 36" 14. Swing Gate leaves over 8' each - Size & Weight of Gate Posts-4" X 10' (6.56 Lbs. Per Foot) 15. Gate Posts Footings-12" X 36" 16. Cantilever Gate post 4" od ss40 17. Type of Concrete-3,000 PSI 18. Type of Fittings-Commercial 19. Tie Wires-9 Gauge Aluminum 20. Tension Wire Top and Bottom -7 Gauge 21. Braces Install every 300 feet on chain link fence 22. Barb wire-12 1/2 Gauge/Install 11,992.6 LF of barb wire fence /See SPEC Sheet #2 23. Braces Installed every 300 Feet on Barbwire fence Qualifications: Manufacturer: Company specializing in manufacturing the products specified in this section shall have a minimum three years documented experience provide at time of bid response. Installer: The installer shall have three years' experience in fencing installation and provide documentation at time of bid. Contractor shall provide a one-year warranty on all parts and labor. Completion Date and Payment Schedule: Payment #1 - Materials drop with a manufacture's invoice and pictures of materials from Military Payment #2 - 50% of remaining balance upon completion and inspection by Military from point #1 to Point #2, see separate document labeled Point 1 to Point 2 VTS-Milan Payment #3 - Remaining balance upon on completion and inspection by Military of completed job Contractor to verify all measurement and any underground utilities before digging on site.

Post-Bid

Military

$190,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
79
Bidding Soon
765
All Active Projects
344
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 31, 2023

October 2, 2023

April 2, 2024

img_map_placeholder

325 Levina Gate Rd, Lavinia, TN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.